# How Stormwater Pipe Inspection &amp; UV Rehabilitation Restored Flow in New Bern, N.C.

**URL:** https://aqualisco.com/case_study/new-bern-n-c-uv-pipe-rehabilitation-improves-stormwater-flow/
**Author:** Hamsata Mazou
**Published:** January 26, 2026

> A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.

---

[Stormwater Pond Vegetation Clearing Restores Compliance in Bothell, Wash. ](https://aqualisco.com/case_study/stormwater-pond-vegetation-clearing-restores-compliance-in-bothell-wash/)

---

## Categories

- Stormwater Repairs
- Pipe Failure
- Case Studies

## Tags

- North Carolina
