Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Illinois Local Compliance

City of Elgin / County of Kane

At AQUALIS, we know Elgin / County of Kane's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Elgin / County of Kane and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/13/2026

 

LONG TERM MAINTENANCE

Long-Term Maintenance

The owner shall maintain that portion of a stormwater drainage system, including any special management areas, located upon his land. With the approval of the Administrator the stormwater drainage system and special management areas, or specified portions thereof, may be—

  1. dedicated or otherwise transferred to and accepted by the permitting authority or other public entity; or
  2. conveyed or otherwise transferred to and accepted by a homeowner’s association, or similar entity, the members of which are to be the owners of all of the lots or parcels comprising the development; or
  3. conveyed to one or more persons or in one or more undivided interests to one or more persons.

Except for those portions of the stormwater drainage system and special management areas to be dedicated or otherwise transferred to the permitting authority or other public entity, included in the application for a stormwater permit shall be a plan for the long term management, operation and maintenance of the stormwater drainage system and special management areas and a description of the sources of funding therefor. Amendments to the plan must be approved by the Administrator.

Inspection and maintenance authority

The County may, upon 30 days’ notice to the owner or occupant, enter upon any lands or waters within the County for the purpose of inspecting and/or maintaining any stormwater facilities or causing the removal of any obstructions to an affected watercourse.

Offenses

Any person who violates, disobeys, omits, neglects, refuses to comply with, or resists the enforcement of any provision of this ordinance (ordinance violation), or any requirement or condition in any permit issued pursuant to this ordinance (permit violation), and, in the case of a permit violation, fails to correct such violation, omission or neglect, or cease such disobedience, refusal or resistance after notice and reinspection as provided below, shall be guilty of an offense under this ordinance.

Whenever the Administrator or Director, as the case may be, determines that a permit violation exists, he shall serve notice of the violation on the permittee. Such notice shall state the nature of the violation and fix a date not less than 10 days after the date of the notice by which the violation shall be corrected and the site reinspected.

Offenses: penalties; remedies

The Administrator or Director may pursue any one or more of the following remedies against any person found by him or her to be guilty of an offense under this ordinance:

  1. The Administrator or Director may impose a civil fine upon such person in an amount not less than $25 and not more than $750. Each calendar day during which such violation continues to exist shall constitute a separate offense.
  2. The Administrator or Director may revoke any stormwater management permit issued to such person.
  3. The Administrator or Director may require that the area impacted be fully restored to its condition existing prior to such development, disturbance or impact. In the case of a wetland impact the area’s pre-existing condition shall be determined by reference to a creditable wetland assessment performed within two years of such impact.
  4. The Administrator or Director may require that the area impacted be fully restored to its condition existing prior to such development, disturbance or impact. In the case of a wetland impact the area’s pre-existing condition shall be determined by reference to a creditable wetland assessment performed within two years of such impact.
  5. The Administrator or Director may require the person to apply “after the fact” for the appropriate permit for an unpermitted development, disturbance or impact. In the case of a wetland impact the FQI of the wetland impacted shall be determined by the Director and mitigation shall be provided accordingly.

In order to enforce any of the remedies set forth in the preceding paragraph, the Administrator or the Director may bring any action, legal or equitable, including an action for injunctive relief, deemed necessary. In any such action, in addition to any fine or other relief, the Administrator or the Director may recover all costs and expenses, including reasonable attorney fees, incurred.

HARMFUL AND PROHIBITED WASTES

Except as otherwise herein provided or permitted, no person shall discharge or deposit directly or indirectly into any sewer or the sewerage system or discharge or deposit or cause or permit to be discharged, deposited or to enter directly or indirectly into Fox River or any other watercourse within the boundaries of the city any solid wastes, industrial wastes or other sewage or liquids or solids, the discharge or entry of which into the sewers or sewerage system is prohibited by the terms of this article or by any other ordinance or which will pollute or defile such portion of Fox River or any such watercourse.

No liquids or solids shall be discharged into or deposited in the sewers or sewerage system or in the Fox River or any watercourse within the boundaries of the city which will pollute the waters of Fox River within the boundaries of the city, or create any nuisance or unsanitary condition, or damage any sewer or any part of the sewerage system, or in any way interfere with, injure or damage the sewage purification processes or the instrumentalities provided for purification of sewage.

All sewers connected directly or indirectly with any sewer without the intervention of a spillway or other diversion arrangement for stormwater shall be constructed so as to be impervious to groundwater infiltration and so as to exclude stormwater therefrom and shall be used to carry only such sewage as is authorized by the terms of this article to be discharged into the sewage system. No person shall discharge or cause to be discharged any stormwater, surface water, groundwater, roof runoff, subsurface drainage, uncontaminated cooling water or unpolluted industrial process waters to any sanitary sewer. All new sewer construction shall provide two (2) separate and distinct sewer systems, one (1) for the collection of stormwater and the other for the collection of sanitary wastes. The above requirements and prohibitions of this section shall include, but not be limited to, the following special provisions.

(1) Downspouts. All downspouts or roof drains shall discharge onto the ground or be connected to storm sewers. No downspouts or roof drains shall be connected to the sanitary sewers.

(2) Footing drains. No footing drains or drainage tile shall be connected to the sanitary sewers.

(3) Sump pumps. Sump pumps installed to receive and discharge groundwater or other stormwater shall be connected to the storm sewer or discharge onto the ground. Sump pumps installed to receive and discharge floor drain flow or other sanitary sewage shall be connected to the sanitary sewers. A sump pump shall be used for one function only, either the discharge of stormwater or the discharge of sewage.

(4) Window well and areaway drains. No window well or areaway drain shall be connected to the sanitary sewer.

It shall be unlawful for any person to connect the discharge from any water flush toilet, the effluent from any septic tank, cesspool, chemical or septic toilet or the overflow therefrom, kitchen, cellar or bathroom drains or industrial wastes with any surface water or stormwater sewer or any tile system installed for the collection of surface and shallow groundwater only, within the city, or to make any connections with such stormwater sewers which permit substances of a polluting nature to enter such sewers.

The public works department shall inspect from time to time the premises of any and all factories, industries, garages, dwellings and other places of business and places located within the boundaries of the city, from which sewage or wastes is discharged, deposited or finds its way either directly or indirectly into Fox River or any other watercourse within the boundaries of the city, or into any sewer or the sewerage system, for the purpose of ascertaining whether any such factory, industry, garage or other place of business or the occupant or owner of any dwelling is complying with the terms and provisions of this article, and shall report from time to time to the council the results of such inspections.

For the purpose of making the inspections herein provided for and for carrying out and enforcing the terms and provisions of this article, the city by its duly authorized engineers, chemists, inspectors, investigators, accountants, attorneys and agents, at any and all reasonable times, shall have access to and the right to inspect the plants, places of business, offices, dwellings and premises of any and all persons subject to the terms of this article and shall have access and the right to inspect the outlets, sewers, drains and other instrumentalities of any factory, industry, garage or other place of business or dwelling for the purpose of ascertaining whether any waste, industrial waste or other liquids or solids prohibited by or coming under or subject to the terms of this article are produced by any such person and for the purpose of determining whether the same are being discharged, deposited or are finding their way either directly or indirectly into Fox River or any other watercourse within the boundaries of the city, or into any sewer or the sewerage system, or for any other purpose necessary or proper for the carrying out and enforcing of the terms and provisions of this article.

The representatives of the city shall be permitted to measure the flow to, from or in any and all outlets, sewers and drains or any part or parts thereof and to take samples from the whole or any part of such flow or discharge at any reasonable time, and shall have access to and may examine and inspect any and all records, books, documents and papers covering or relating or pertinent to the determination of the nature, character, extent and volume of any such wastes or industrial wastes and the methods of the treatment, disposal or discharge thereof, and shall be permitted to make and take copies and notes with reference thereto.

(a) If the public works director shall determine that any factory, industry, garage, place of business or other place or the occupant and/or owner of any building, dwelling or other place is not complying with the terms and provisions of this article, then the director or other authorized representative of the city shall serve or cause to be served upon any such person not so complying, a notice in writing stating and setting forth wherein or in what regard such person or party is failing to comply with the terms and provisions of this article and further notifying such person that within one (1) year, or in the case of violations of section When stormwater must be excluded, paragraph (1) sixty (60) days, from the receipt of such notice, or immediately in the case of random inspections of new construction under this article, he shall either cease to discharge such waste, industrial waste or other liquids or solids prohibited by this article or in lieu thereof, if applicable, that such person shall within one (1) year, or in the case of violations of When stormwater must be excluded, paragraph (1) sixty (60) days, adopt and install such method or methods, process or processes, instrumentalities or apparatus for the treatment of its sewage, industrial wastes and other wastes. From and after the expiration of such applicable period such person shall thereafter continuously and efficiently carry out, operate and maintain such method or methods, process or processes, instrumentalities or apparatus and shall thereafter continuously treat its sewage, industrial wastes and other wastes in such manner that the sewage or effluent discharged from the premises shall be of such character and quality as is permitted by the terms and provisions of this article; provided, however, that if compliance with the terms of this article by such person or party does not require the adoption or installation of any additional methods, equipment, apparatus or instrumentalities, any such person or party shall forthwith from and after the receipt by him or it of such notice thereafter continuously comply with the terms and provisions of this article. In the case of new construction, compliance with this article must be verified by reinspection at the owner’s expense prior to receipt of a certificate of occupancy under the zoning ordinance and building code; provided, however, that in the event of a new construction violation within an ongoing development or subdivision, all other current new construction therein shall thereupon be inspected under this article at the developer’s expense. If any person or party receiving notice under this section shall produce satisfactory evidence to the city council that he cannot comply with the terms of such notice and the terms and provisions of this article within the applicable period, then the city council, in its discretion, may grant to such person or party such extension of time as the city council shall deem necessary or proper.

(b) Additionally, the city council may grant any person or party not in compliance with this article, as it pertains to sanitary and/or stormwater runoff, a variation from the terms and provisions thereof. An application for variance shall be in writing and shall set forth the basis for the variation request. An application for variance may be made at any time, provided, however, that no application will be accepted more than thirty (30) days after a notice of violation has been served. The application shall be acted upon by the city council after first holding a public hearing before the planning and development committee of the council. The hearing shall be held not less than fourteen (14) days after receipt of an application for variance. For all applications, public notice shall be mailed by the applicant. Such notices shall be mailed after a public hearing date has been scheduled by the chairman of the planning and development committee. The notices shall be mailed to the district manager of the Fox Metro Water Reclamation District as well as to all owners of record within two hundred fifty (250) feet in each direction of the location of the property in question. The owners of record within the two-hundred-fifty-foot requirement shall be determined by consulting the tax assessor’s rolls of the township or county in which the property is located, provided the number of feet occupied by all public roads, streets, alleys and other public ways shall be excluded in computing the two-hundred-fifty-foot requirement. The notice shall be in writing and shall contain the following information:

(1) Common address of the property;

(2) Requested action;

(3) Date, time and place of hearing;

(4) Reference to engineering department of the city for further information;

(5) Telephone number of engineering department.

The notice shall be mailed not more than twenty-one (21) days, nor less than seven (7) days in advance of such hearing. The notice shall be sent by first class mail, properly addressed as shown on the assessor’s rolls and with sufficient postage affixed thereto. Proof of mailing certificates, as provided by the U.S. Postal Service, shall be submitted to the chairman of the planning and development committee at least three (3) days prior to the hearing date and shall be made part of the hearing record. A copy of the notice is to be sent to the city engineer. The applicant shall also file a sworn affidavit containing a complete list of the owners of record required to be served, the method of service, and names and addresses of the persons so served with copies of the notice.

(c) The following, while neither controlling nor fully measuring the city council’s discretion, are deemed indicative of the criteria which may cause a variation request to be granted:

(1) The effect of the water runoff in question upon the overall runoff being introduced into the sewer system and, in particular, the effect of the runoff upon downstream users;

(2) The cost of repairs, as evidenced by no less than two (2) written contractor’s estimates, in relation to the assessed value of the property in question;

(3) Previous city approval, either explicit or implicit, with regard to sanitary and/or stormwater runoff; and

(4) The length of time the applicant or his predecessors has relied upon the aforesaid city approval.

(d) The penalties for violations under this article shall be as provided and violating persons shall be subject to all other remedies or actions authorized by the building code as now or hereafter amended.

View State Page

Frequently Asked Questions

It depends on what happens after construction. The property owner maintains the system by default, but with the administrator’s approval, it can instead be dedicated to a public entity, transferred to a homeowner’s association whose members are all the lot owners in the development, or conveyed to one or more individual persons. Whichever path applies, unless the system goes to a public entity, the original stormwater permit application has to include a long-term management and maintenance plan along with a description of how it will be funded.

Generally, no. The county can enter property to inspect or maintain stormwater facilities, or to remove obstructions from an affected watercourse, but only after giving the owner or occupant 30 days notice first. That’s a longer notice window than many neighboring jurisdictions require, giving property owners real time to prepare before an inspector shows up.

The administrator or director sets a correction deadline of at least 10 days from the notice date, with reinspection to follow. If the violation isn’t fixed by then, a civil fine between $25 and $750 applies, and each calendar day the violation continues counts as a separate offense. Beyond the fine, the city can revoke the stormwater permit entirely, require full restoration of the impacted area to its pre-development condition, or require the owner to apply for an after-the-fact permit covering whatever went in without one.

No, and the code is specific about it. Downspouts and roof drains have to discharge onto the ground or connect to storm sewers, never sanitary sewers, and the same goes for footing drains and window well or areaway drains. Sump pumps are restricted to a single function: one handling stormwater has to go to the storm sewer or discharge onto the ground, while one handling sanitary flow goes to the sanitary sewer, and a single pump can’t be used for both purposes.

The public works department inspects factories, industries, garages, dwellings and other places of business on an ongoing basis to check compliance, and city representatives retain the right to enter and inspect at any reasonable time, including taking flow samples and reviewing records related to waste discharge. For new construction specifically, compliance has to be verified through reinspection, at the owner’s expense, before a certificate of occupancy will be issued.

Yes, through a formal process, but it comes with real procedural requirements. The application has to be submitted within 30 days of receiving a notice of violation, and the city council decides after a public hearing, with notice mailed to every property owner within 250 feet of the site as well as the Fox Metro Water Reclamation District. The council weighs factors like the runoff’s downstream impact, repair costs relative to the property’s assessed value, and whether the city previously approved the situation, so a variance isn’t guaranteed just because compliance would be expensive.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Elgin / County of Kane and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.