Kentucky Local Compliance

City of Bardstown

At AQUALIS, we know Bardstow's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Bardstown and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/18/2026

EXCERPT- Bardstown Post Construction Page

Typically most construction will add areas that are impervious to water for example roofs and parking areas. It is important therefore that these impervious areas are accounted for, along with any pollutants that may run off these areas by ensuring that appropriate controls are installed to manage stormwater from each site once construction is completed.

These Best Management Practices (BMP’s) can include structural and non-structural controls such as detention ponds, infiltration trenches and Catch basin screens.

EXCERPT- Bardstown Drainage Control Ordinance

DESIGN CRITERIA; PERFORMANCE STANDARDS

§ 156.15 STORMWATER MANAGEMENT PLAN.

(A) A stormwater management plan shall be required for any new single-family residential developments having a gross aggregate area, including roads, utility rights-of-way, and any other dedicated lands of five or more acres, and having a density of greater than one dwelling unit per acre or for any new commercial, multi-family residential, industrial, institutional, or utility development having a gross aggregate area of 0.5 acres or more; provided that all such development is located in areas designated as “severe” or “high” on the watershed drainage map. A plan shall also be required for any new development or redevelopment of fully developed areas as designated on the watershed drainage map. The official watershed drainage map shall be kept in the office of the City Civil Engineer. No final subdivision plat shall be approved and no building permits shall be issued until and unless the stormwater management plan has been reviewed and approved by the City Civil Engineer. Owners of residential property within subdivisions for which final subdivision plats have been approved prior to the date of the approval of this chapter shall not be required to comply with this chapter. The City Civil Engineer or his or her duly authorized designees may also require stormwater management plans for any drainage area if adverse impacts are anticipated. A stormwater management plan may also be required prior to any grading or excavation which would fill, obstruct, or otherwise alter any creek, stormwater channel, or drainage facility.

(B) The required stormwater management plan shall identify means for controlling the stormwater runoff release rate from the development and providing storage potential for the excess stormwater runoff (where required). All computations, plans and specifications related to the implementation of this chapter must be prepared and sealed by a professional engineer registered in the state.

(1) Requirements for controls of runoff for projects under construction/new construction. The following best management practices, which address the problem of urban runoff, shall apply to all projects undergoing construction in the city. The best management practices list set forth below is the minimum required by the city. Any BMP or BMP Plan utilized shall be equal to or more effective than the BMPs contained in the Kentucky Erosion Prevention and Sediment Control Manual and Field Guide.

(D) Stormwater Pollution Prevention Plan (SWPPP). Any land disturbing activity that disturbs 0.5 acres of land or more is required to submit a SWPPP to the Office of the City Civil Engineer. For all sites that disturb one acre or more, a notice of intent (NOI) must be filed with the Kentucky Division of Water as well as the SWPPP prior to any disturbance. The NOI and SWPPP shall be submitted with the design plans and stormwater management plan to the Office of the City Civil Engineer. The SWPPP shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed grading on water resources, and measure proposed to minimize soil erosion and off-site sedimentation. The owner/developer, contractor shall perform all clearing, grading, drainage, construction, and development in strict accordance with the approved plan and this chapter.

§ 156.18 POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN.

(C) Post-construction stormwater management plan (PC-SWMP).

(1) A post-construction stormwater management plan (PC-SWMP) shall be submitted for all subdivisions that discharge to MS4 high quality waters. This includes residential, commercial, and industrial developments. The PC-SWMP is required for all sites one acre and larger in size, and all sites part of a greater common development.

(2) The city reserves the right to develop or adopt other guidance documents to serve as design and implementation standards. Other guidance documents distributed by the city should be reviewed and considered when preparing the PC- SWMP. These documents may be applied as standards by which designs are to be prepared and controls implemented.

(3) The city shall have the authority to implement this chapter by appropriate regulations, guidance or other related materials. In this regard, technical, administrative, or procedural matters may be modified as needed to meet the objectives herein. (Ord. B2011-19, passed 9-27-11) Penalty, see § 156.99

BONDS, MAINTENANCE, ASSURANCES, AND FEES

§ 156.31 MAINTENANCE AGREEMENT.

(A) General. Individual property owners, whether residential or commercial, shall be responsible for the general and overall maintenance of the drainage easements and the street right-of-way ditch. Such maintenance includes mowing, keeping the drainway free of leaves and debris, and following the guidelines within this chapter. Property owners shall install and maintain their permitted entrance pipe. The pipe shall be kept free of debris, and excess sediment that builds up over time, which constricts the flow of the street runoff. No one shall “fill-in” the right-of-way ditch or any drainage way without first obtaining an land disturbance permit. All proposed piping of ditches shall be appropriately sized and may be required to have a catch basin to allow for intake of surface water. The property owner shall ensure that adequate vegetation remains in the drainway and provide a hardened surface where applicable to prevent erosion.

(B) Stormwater maintenance agreement. A stormwater maintenance agreement, approved by the City Civil Engineer, assuring perpetual maintenance of storm water management improvements, including post-construction BMPs, shall be executed by the applicants to the City of Bardstown. The agreement shall be recorded among the deed records in the Nelson County Clerk’s office upon final plan approval. The agreement shall be a covenant running with the land and shall be binding on the landowner, its administrators, executers, heirs, assigns and any other successors of interest, including any homeowners association. A copy of an appropriate maintenance agreement can be obtained from the City Engineering Department.

(1) Operation and maintenance of all stormwater quality and quantity devices, BMPs, and drainage ways shall be the responsibility of the property owner. Operation and maintenance shall be required sufficient to maintain proper function and water quality at the discharge point.

(2)      (a) Routine inspections are the responsibility of property owner to ensure the stormwater facilities/BMPs are operating and functioning as designed and that required maintenance activities have occurred. The property owner must submit an inspection report annually to the city. The report shall include any action taken, who took it, when the action was done, how it was done, and any problems encountered or follow-up actions recommended. Maintenance problems shall be inspected monthly or more frequently as necessary to assure safe and proper functioning of the facilities.

(b) Example post-construction stormwater facility/BMP maintenance inspection checklists are available at the Office of the City Civil Engineer.

(3) The city and its agents shall have the right of entry to inspect, observe, test or perform any other related activity to the operation, maintenance, and function of the stormwater infrastructure. The city has the right to perform inspections and emergency maintenance on the facilities; however, it is not the city’s obligation to maintain the stormwater quality/quantity facility. (Ord. 432, passed 5-16-90; Am. Ord. B2006-8, passed 5-23-06; Am. Ord. B2011-19, passed 9-27-11)

§ 156.50 ENFORCEMENT PROCEDURE.

The City Civil Engineering Department in conjunction with Bardstown Public Works and Code Enforcement shall be responsible for the enforcement of this chapter. Duly authorized representatives have the authority to issue notices of violation, stop work orders, and levy fines. Enforcement actions shall be served to the property owner as listed on the permit or most current property owner as held by the PVA office.

(A) Notice of deficiency (NOD). If any site violates the conditions of this chapter when inspected by the city’s authorized representative, a NOD shall be issued to the violator. The NOD may be verbal or written to either NOI holder or the property owner. The violator shall be given seven (7) calendar days, or as directed by the City Civil Engineer or designee, to correct the deficiency per the details as specified in the NOD.

(B) Notice of violation (NOV). A written NOV shall be issued to either the holder of the NOI or the owner(s) of the site, when previously sited, does not comply with the terms of the NOD within the time period given. The violator shall be given five (5) calendar days to correct the deficiency per the details as specified in the NOV. The city’s authorized representative has the right to modify the timeframe for  corrections based on his/her judgment, due to project conditions.

(E) Post-construction stormwater management facilities/BMPs.

(1) When deficiencies are noted upon inspection by the city, the city shall provide the property owner copies of the inspection report with findings and evaluations. The owner then has thirty (30) days to get the stormwater facilities in working order as per its original design function.

(2) In the event the property owner neglects to make repairs upon notification, and/or fails to maintain the stormwater management facilities in good working condition acceptable to the city, the city may enter upon the property and take whatever steps it deems necessary to maintain said stormwater management/BMP facilities and to charge the costs of the repairs to the landowner, its successors and assigns. This provision shall not be construed to allow the City of Bardstown to erect any structure of a permanent nature on the property of the landowner, outside of an easement for stormwater management/BMP facilities. It is expressly understood and agreed that the city is under no obligation to maintain or repair the facilities.

(3) In the event the city performs work of any nature or expends any funds in performance of the work for labor, use of equipment supplies, materials, and the like on account of the landowner, its successors and assigns, the landowner shall reimburse the city upon demand, within thirty (30) days of receipt thereof for all costs incurred by the city. (Ord. 432, passed 5-16-90; Am. Ord. B2006-8, passed 5-23-06; Am. Ord. B2011-19, passed 9-27-11)

§ 156.99 PENALTY.

Any person, firm, or corporation who violates or fails to comply with any of the provisions of this chapter shall be guilty of a misdemeanor, and upon conviction, shall be subject to a fine of not less than $25, nor more than $250, and in addition shall pay all costs and expenses involved in the case. Violators of this chapter may be issued a citation by the officer in charge of enforcement. In addition or in the alternative, any person determined to be in violation of this chapter may be assessed civil penalties or fines, those fines assessed through the Code Enforcement Board process as provided in §§ 34.20 through34.33 in the amount of no less than $50 nor more than $150 for the first offense, no less than $75 nor more than $200 for the second offense and no less than $100 nor more than $250 for any subsequent offense. A separate offense shall be deemed committed upon each day during or on which a violation occurs or continues. (Ord. 432, passed 5-16-90; Am. Ord. B2006-8, passed 5-23-06; Am. Ord. B2011-19, passed 9-27-11; Am. Ord. B2015-30, passed 12-8-15)

View State Page

Frequently Asked Questions

Any new commercial, multi-family, industrial, institutional or utility development with a gross aggregate area of half an acre or more triggers the requirement, provided the site sits in an area the city’s watershed drainage map designates as “severe” or “high.” No final subdivision plat gets approved and no building permit gets issued until the City Civil Engineer has reviewed and approved the plan, and the City Civil Engineer can also require a plan for any drainage area where adverse impacts are anticipated, even outside those size thresholds.

Yes, if the land disturbance covers half an acre or more, in which case a SWPPP has to go to the Office of the City Civil Engineer. Sites disturbing a full acre or more carry an added requirement: a Notice of Intent has to be filed with the Kentucky Division of Water before any disturbance begins, submitted alongside the SWPPP and design plans. Every part of construction, clearing, grading, drainage work and development, has to follow the approved plan exactly.

The property owner, on a perpetual basis. A stormwater maintenance agreement approved by the City Civil Engineer has to be recorded with the Nelson County Clerk, and it runs with the land as a binding covenant on the owner and every future successor, including any homeowners association. The owner also has to submit an annual inspection report to the city covering what maintenance action was taken, when, how, and any problems that turned up, with more frequent monthly checks required if a maintenance issue is identified.

It starts with a Notice of Deficiency, giving the violator seven calendar days to correct the issue. If that deadline passes, a written Notice of Violation follows with a tighter five-day correction window. For post-construction BMP deficiencies specifically, the owner gets 30 days after receiving the inspection findings to restore the facility to its original design function; missing that window lets the city step in, perform the repair itself, and bill the landowner for the full cost within 30 days of the work.

A conviction is a misdemeanor carrying a fine between $25 and $250, plus all case costs and expenses. The city can also pursue civil penalties through its Code Enforcement Board process, starting between $50 and $150 for a first offense and climbing to $100 to $250 for any offense after the second. Each day a violation continues or occurs counts as a separate offense, so an unresolved deficiency accumulates cost quickly the longer it sits.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Bardstown and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.