The City of Portland has enacted a Stormwater management ordinance to address the effects of development on both the quantity and quality of stormwater runoff and to help the City satisfy the requirements of its NPDES permit. The City of Portland is an EPA designated MS4 and sets forth requirements for all persons discharging stormwater and/or non-stormwater discharges from any property or premises into the storm drainage system. All developments must submit a stormwater management plan pursuant to the regulations of Maine DEP Chapter 500 before any land-disturbing activity can occur. Then, the developed land must adhere to the stormwater management plan through routine maintenance and inspections of the stormwater facilities onsite. The City of Portland, under the conditions of its NPDES permit, has the authority to inspect properties and may issue a Notice of Violation (N.O.V.) for non-compliance.
A. Basic standards
(1) When the basic standards must be met. A project disturbing one acre or more must meet the basic standards. Basic standards are specified in Appendices A, B, and C of this chapter and address erosion and sedimentation control, inspection and maintenance, and housekeeping, respectively.
A project qualifies for a stormwater permit by rule (PBR) described in Section 7, and therefore need only meet basic standards, if it results in one or more acres of disturbed area and the following.
(a) Lakes most at risk and urban impaired streams. Less than 20,000 square feet of impervious area and 5 acres of developed area in the direct watershed of a lake most at risk or urban impaired stream; and
(b) All other watersheds. Less than one acre of impervious area and five acres of developed area in any other watershed.
(2) Grading or other construction activity. Grading or other construction activity on any site disturbing one acre or more may not impede or otherwise alter drainage ways to have an unreasonable adverse impact on a protected natural resource.
C. Basic standards submissions. These submissions are required for all sites except those that qualify for stormwater PBR described in Section 7. An erosion and sedimentation control plan or an inspection and maintenance plan for a project that does not qualify for a stormwater PBR must be prepared by a professional engineer registered in the State of Maine, or a certified erosion and sedimentation control professional.
(2) Inspection and maintenance plan. Submit a plan for the inspection and maintenance of the temporary and permanent erosion and sedimentation controls for the project site as described in Appendices A and B of this chapter. At a minimum, the inspection and maintenance plan must include the following:
(3) Housekeeping. Submit a plan to address spill prevention, groundwater protection, fugitive sediment and dust, debris and other materials, trench or foundation de-watering, or non-stormwater charges, as applicable to the specific site. Housekeeping requirements are described in Appendix C of this chapter.
This appendix applies to all projects. A project that is only required to meet basic standards (stormwater PBR) must meet the standards in Section 1. All other projects must meet standards in Sections 1 through 5.
See Appendix D (5) for additional maintenance requirements related to infiltration of stormwater.
Post-construction. The following standards must be met after construction.
(a) Plan. Carry out an approved inspection and maintenance plan that is consistent with the minimum requirements of this section. The plan must address inspection and maintenance of the project’s permanent erosion control measures and stormwater management system. This plan may be combined with the plan listed in Section 2(a) of this appendix. See Section 8(C) (2) for submission requirements.
(b) Inspection and corrective action. All measures must be maintained in effective operating condition. A person with knowledge of erosion and stormwater control, including the standards and conditions in the permit, shall conduct the inspections. The following areas, facilities, and measures must be inspected and identified deficiencies must be corrected. Areas, facilities, and measures other than those listed below may also require inspection on a specific site. Inspection or maintenance tasks other than those discussed below must be included in the maintenance plan developed for a specific site. NOTE: Expanded and more-detailed descriptions for specific maintenance tasks may be found in the Maine DEP’s “Stormwater Management for Maine: Best Management Practices.”
(c) Regular maintenance
(d) Documentation. Keep a log (report) summarizing inspections, maintenance, and any corrective actions taken. The log must include the date on which each inspection or maintenance task was performed, a description of the inspection findings or maintenance completed, and the name of the inspector or maintenance personnel performing the task. If a maintenance task requires the clean-out of any sediments or debris, indicate where the sediment and debris was disposed after removal.
The log must be made accessible to department staff and a copy provided to the department upon request. The permittee shall retain a copy of the log for a period of at least three years from the completion of permanent stabilization.
3. Maintenance contract. Contract with a third-party or other qualified professional, as approved by the department, for the removal of accumulated sediments, oils, and debris within any proprietary devices and the replacement of any absorptive filters. The frequency of sediment clean-out and filter replacements must be consistent with the unit’s storage capacity and the estimated pollutant load from the contributing drainage area. This clean-out frequency is usually established by the manufacturer of the proprietary system when sizing the device for the project.
4. Re-certification. Submit a certification of the following to the department within three months of the expiration of each five-year interval from the date of issuance of the permit.
5. Duration of maintenance. Perform maintenance as described and required in the permit unless and until the system is formally accepted by the municipality or quasi-municipal district, or is placed under the jurisdiction of a legally created association that will be responsible for the maintenance of the system. If a municipality or quasi-municipal district chooses to accept a stormwater management system, or a component of a stormwater system, it must provide a letter to the department stating that it assumes responsibility for the system. The letter must specify the components of the system for which the municipality or district will assume responsibility, and that the municipality or district agrees to maintain those components of the system in compliance with department standards. Upon such assumption of responsibility, and approval by the department, the municipality, quasi-municipal district, or association becomes a co-permittee for this purpose only and must comply with all terms and conditions of the permit.
6. Additional requirements. Additional requirements may be applied on a site-specific basis.
Sec. 32-36. Applicability.
This article applies to all development projects that require a stormwater management plan pursuant to section V of the department of planning and urban development’s Technical and Design Standards and Guidelines.
(Ord. No. 35-09/10, 8-17-09)
Sec. 32-37. Post-construction stormwater management plan approval.
Notwithstanding any ordinance provision to the contrary, no applicant for a development project to which this article is applicable shall receive approval for that development project unless the applicant also receives approval for its post-construction stormwater management plan and for the best management practices (“BMPs”) for that development project.
Sec. 32-38. Post-construction stormwater management plan compliance.
Any person owning, operating, or otherwise having control over a BMP required by a post construction stormwater management plan shall maintain the BMPs in accordance with the approved plan and shall demonstrate compliance with that plan as follows:
(a) Inspections. The owner or operator of a BMP shall hire a qualified post-construction stormwater inspector to at least annually, inspect the BMPs, including but not limited to any parking areas, catch basins, drainage swales, detention basins and ponds, pipes and related structures, in accordance with all municipal and state inspection, cleaning and maintenance requirements of the approved post-construction stormwater management plan.
(b) Maintenance and repair. If the BMP requires maintenance, repair or replacement to function as intended by the approved post-construction stormwater management plan, the owner or operator of the BMP shall take corrective action(s) to address the deficiency or deficiencies as soon as possible after the deficiency is discovered and shall provide a record of the deficiency and corrective action(s) to the department of public services (“DPS”) in the annual report.
(c) Annual report. The owner or operator of a BMP or a qualified post-construction stormwater inspector hired by that person, shall, on or by June 30 of each year, provide a completed and signed certification to DPS in a form provided by DPS, certifying that the person has inspected the BMP(s) and that the yare adequately maintained and functioning as intended by the approved post-construction stormwater management plan, or that they require maintenance or repair, including the record of the deficiency and corrective action(s) taken.
(d) Filing fee. Any persons required to file and annual certification under this section shall include with the annual certification a filing fee established by DPS to pay the administrative and technical costs of review of the annual certification.
(e) Right of entry. In order to determine compliance with this article and with the post-construction stormwater management plan, DPS may enter upon property at reasonable hours with the consent of the owner, occupant or agent to inspect the BMPs.
(Ord. No. 35-09/10, 8-17-09)
Sec. 32-39. Enforcement.
It shall be unlawful for any person to violate any provision of or to fail to comply with any of the requirements of this article or of the post-construction stormwater management plan. Whenever the enforcement authority believes that a person has violated this article, DPS may enforce this article in accordance with 30-A M.R.S.A. § 4452. Each day on which a violation exists shall constitute a separate violation for purposes of this section.
(a) Notice of violation. Whenever DPS believes that a person has violated this article or the post-construction stormwater management plan, DPS may order compliance by written notice of violation to that person indicating the nature of the violation and ordering eh action necessary to correct it, including, without limitation:
(1) The abatement of violations, and the cessation of practices or operations in violation of this article or of the post-construction stormwater management plan;
(2) At the person’s expense, compliance with BMPs required as a condition of approval of the development project, the repair of BMPs and/or the restoration of any affected property; and/or
(3) The payment of fines, of the City’s remediation costs and of the City’s reasonable administrative costs and attorneys’ fees and costs.
(4) If abatement of a violation, compliance with BMPs, repair of BMPs and/or restoration of affected property is required, the notice shall set forth a deadline within which such abatement, compliance, repair and/or restoration must be completed.
(b) Penalties/fines/injunctive relief. In addition to the imposition of any other costs or penalties provided for herein, any person who violates this section shall be subject to fines, penalties and orders for injunctive relief and shall be responsible for the city’s attorney’s fees and costs, all in accordance with 30-A M.R.S.A. § 4452. Each day such violation continues shall constitute a separate violation. Moreover, any person who violates this section also shall be responsible for any and all fines, penalties, damages and costs, including, but not limited to attorneys’ fees and costs, incurred by the city for violation of federal and state environmental laws and regulations caused by or related to that person’s violation of this article; this responsibility shall be in addition to any penalties, fines or injunctive relief imposed under this section.