Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Connecticut Local Compliance

City of Bridgeport

At AQUALIS, we know Bridgeport's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Bridgeport and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 07/23/2026

The City of Bridgeport has enacted a Stormwater Ordinance in order to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing in watersheds within this jurisdiction.  The City of Bridgeport  is the permitting authority for all land disturbing activities and requires the land owner to maintain all on-site stormwater control facilities and all open space areas (e.g. parks or “green” areas) required by the approved stormwater control planThe City of Bridgeport will only provide construction permits to projects that establish a plan to manage stormwater runoff occurring during the construction process. The City of Bridgeport, under the NPDES program, also has the authority to inspect properties for noncompliance and can issue a notice of violation (NOV) for any deficiency or infraction onsite. Property owners are responsible for the maintenance of any stormwater facilities or practices located on the property. The City of Bridgeport has the authority to inspect stormwater facilities and practices in order to ascertain that they are properly maintained and functioning.

Bridgeport Zoning & Subdivision Regulations

Section 4-13 – Stormwater Management Regulations

a. Purpose: The intent of the City of Bridgeport’s comprehensive stormwater management program is to fulfill relevant state statutes, reduce soil erosion and sediment deposition resulting in water pollution and damage to land and resources, reduce damage from stormwater runoff; protect Long Island Sound’s resources, ecosystems and habitats, minimize sediment pollution resulting from land development activities, and reduce pollutants from, detain, and/or retain, and provide a destination for stormwater to best preserve or mimic the natural hydrologic cycle, to accomplish the goals of reducing and controlling stormwater runoff, or to fit within the capacity of existing infrastructure.

b. Authority: Activities with the potential for stormwater impacts shall be controlled by the City of Bridgeport’s official Stormwater Management Manual, as updated from time to time. The manual is issued by the City Engineering Department, with the assistance of the Water Pollution Control Authority. These agencies are responsible for reviewing and approving the stormwater management component of applications before the Planning and Zoning Commission, or any other reviewing and approving body. The Planning and Zoning Commission, or other approval body, shall not issue an application approval until and unless the City Engineering Department and/or the Water Pollution Control Authority has granted final approval for the stormwater management component. The Planning and Zoning Commission, or other approval body, is not authorized to grant a waiver to the manual’s requirements.

c. Reference: The City of Bridgeport’s official Stormwater Management Manual, as updated from time to time, is incorporated into these regulations by reference.

Bridgeport Stormwater Management Manual

All projects which generate earth disturbance of 20,000 square feet or more (5,000 sq ft or more in flood prone areas) must comply to the greatest extent practical with the requirements of the Storm Water Management Regulations. There are four major elements to the Bridgeport Storm Water Regulations: Water Quality, Water Quantity, Channel Protection, and Flood Control Requirements.

The flood insurance study for the City of Bridgeport has designated areas as Zone A, areas inundated by a 100-year flood and Zone V, areas of 100-year coastal flood with velocity (wave action).

The Water Quality Requirement concerns the first one inch of precipitation over Directly Connected Impervious Areas from each storm and is established to: (1) recharge the groundwater table and increase stream base flows; and (2) reduce contaminated runoff from sites as well as to improve water quality discharge into Long Island Sound.

1) The management technique required is infiltration unless infiltration is determined to be physically impossible (due to contamination, high groundwater table, shallow bed rock, poor infiltration rates) or where it can be shown that doing so would cause property or environmental damage.

2) Where infiltration is not feasible for the entire inch, any remaining portion of the initial inch of precipitation from a storm that cannot be infiltrated must be treated for water quality using the secondary treatment practices found in the CTDEPSWQM.

All storm water management practices shall be designed to capture and treat storm water runoff according to the specifications outlined in the CTDEP 2004 Connecticut Storm Water Quality Manual.  These specifications will designate the water quantity and quality treatment criteria that apply to an approved storm water management practice. All storm water management practices shall be designed to convey storm water but allow for the maximum removal of pollutants and reduction in flow velocities. This shall include, but not be limited to:

  1. Maximizing length of flow paths from inflow points to outflow points of basins, pools and ponds.
  2. Protection of inlet and outfall structures.
  3. Elimination of erosive flow velocities.
  4. Provision of underdrain systems, where applicable.

All storm water management practices must have a landscaping plan detailing the vegetation to be planted after construction is finished.

The use of non-structural best management practices is encouraged in order to minimize the reliance on structural practices

Flow control is intended to protect downstream properties, infrastructure, and natural resources from the increases in storm water runoff peak flow rates and volumes resulting from development. Storm water runoff from almost all the developed areas of the City, whether served by separate storm water sewers or combined sewers, is causing impairment to the aquatic and riparian habitats of streams and rivers in Bridgeport. These water bodies are suffering from streambank and channel erosion resulting in the exposure of sewer infrastructure and decreased stream baseflow due to reduced groundwater recharge. The streams do not support healthy aquatic communities, do not meet uses designated by the State, do not serve as amenities to the community, and occasionally cause property damage due to flooding.

The City’s policy is to ensure that runoff leaving the post-development site:

  • Does not exceed the capacity of the receiving conveyance facility or water body.
  • Does not increase the potential for stream bank and stream channel erosion.
  • Does not add significant volume to an existing closed depression, such as Lake Forest or other similar geologic features found throughout the City.
  • Does not create or increase any upstream or downstream flooding problems.
  • Does not create or increase the occurrence of CSOs or basement sewer backups.

The basic design concept for flow control (detention and retention) is simple: water from developed areas is managed with a variety of flow control techniques and released to downstream conveyance systems at a slower rate (detention) and lower volume (retention). Managing flows in this way attempts to mimic the site’s natural rainfall runoff response prior to development

Storm sewers discharging to surface waters in Bridgeport are regulated under the NPDES. Measures required under NPDES storm water permits include storm water management during construction and storm water management on the developed site after construction.

Sections of Bridgeport’s land area is served by sewers that carry sanitary sewage and storm water in a single pipe. During dry weather, all this flow is treated at water pollution control plants before discharge to receiving waters. During wet weather, total flow exceeds the capacity of the sewer system and a portion of the flow (combined sewer overflow) is discharged untreated to receiving waters.

Storm water management is an integral part of Bridgeport’s approach to CSO management. United States Environmental Protection Agency’s (USEPA) CSO Control Policy, published in 1994, promotes effective storm water management on a watershed basis.

All site designs shall establish storm water management practices to control the peak flow rates of storm water discharge associated with specified design storms and reduce the generation of storm water. The most effective practices increase infiltration and evaporation at the site level and reduce the amount of wet weather flow in the sewer system. These practices should seek to utilize pervious areas for storm water treatment and to infiltrate storm water runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. Other practices detain storm water and release it to the sewer system at a slower rate, taking advantage of sewer system capacity over a longer period of time. These techniques are most effective during small storms. Techniques designed to limit streambank erosion and flood damage during large storms work equally well in areas of combined sewers and separate storm sewers.

Dry detention basins are utilized for the detention of storm water to reduce the peak discharge and release the stored water at an acceptable and controlled rate. Dry detention basins shall be designed to drain completely within 72 hours.

Detention structures can be categorized as dry basins, underground storage facilities, and multi-use storage areas such as parking lots, roadway shoulder, and other shallow holding areas. Structures for detention of storm water may be considered together since the major control structures functions the same for each. The maximum depth of storm water allowed at any location in a parking lot shall be six (6) inches.

Control structure release rates shall approximate pre-developed peak runoff rates for the two (2), ten (10), and twenty five (25) year storms, with emergency overflow capable of handling the 100-year discharge. Measures should be employed to prevent the clogging of the outlet structure.

A minimum freeboard of one (1) foot above the 100-year water surface elevation shall be provided for all impoundments. The 100-year event shall be routed through the facility to ensure that the embankment will not be damaged or fail during the passage of that storm.

Relief may be granted from the one hundred (100) year storm design requirements for existing sites with the approval of the City Engineer and provided that:

  1. The physical constraints of site will not allow for construction of a basin for the one hundred (100) year storm event.
  2. Any possible increase in runoff will not adversely impact adjacent properties and area upstream and down stream from the project.

Fencing may be required around the detention basin for public safety. An access gate shall be provided for maintenance purposes. The maintenance of all detention basins, which are required, will be the responsibility of the private property owner(s).

Detention basins shall be constructed as part of the first phase work and incorporate sedimentation and erosion controls to minimize the impacts of construction on adjacent watercourses. Detention basin embankments shall have a minimum top width of eight (8) feet along the access side of the basin. The bottom of the facility shall slope at 0.5% minimum toward the outlet.

The calculations for the detention pond shall provide information on the impacts of the outflow hydrograph from the detention basin on the existing drainage systems and/or watercourse. Detention basins that discharge to combined sewers may only discharge 90% of the peak rate of the 10-year predevelopment flow. Storage outflows greater than that rate (i.e. 25-, 50-, 100-year) must be detained longer onsite to ensure that the basin discharge does not overload the combined sewer.

View State Page

Frequently Asked Questions

Any project disturbing 20,000 square feet or more, or as little as 5,000 square feet if the site sits in a flood-prone area. That flood-prone threshold is four times more sensitive than the standard trigger, so a smaller project near Zone A or Zone V flood areas can face the same requirements as a much larger site elsewhere in the city.

No. The Commission, or any other reviewing body, isn’t authorized to grant a waiver from the Stormwater Management Manual’s requirements, and can’t approve an application at all until the City Engineering Department and Water Pollution Control Authority have separately granted final approval on the stormwater component.

It targets the first inch of precipitation falling on directly connected impervious areas from each storm, aimed at recharging groundwater and reducing contaminated runoff into Long Island Sound. Infiltration is the required method unless it’s physically impossible due to contamination, a high groundwater table, shallow bedrock, or poor infiltration rates, or would cause property or environmental damage. Any portion of that first inch that can’t be infiltrated has to be treated through secondary practices under Connecticut’s stormwater quality manual.

Within 72 hours. That’s specifically to prevent basins from holding water longer than intended, which both protects downstream infrastructure and avoids creating standing water problems on-site.

Lorem ipsum dolo

The private property owner. Bridgeport’s manual states this directly: maintenance of all required detention basins is the property owner’s responsibility, not the city’s, and an access gate has to be built into any required fencing specifically to allow for that maintenance.

r sit amet, consectetur adipiscing elit. Ut et massa mi. Aliquam in hendrerit urna. Pellentesque sit amet sapien fringilla, mattis ligula consectetur, ultrices mauris. Maecenas vitae mattis tellus. Nullam quis imperdiet augue. Vestibulum auctor ornare leo, non suscipit magna interdum eu. Curabitur pellentesque nibh nibh.

Yes, and the limit is stringent. Basins discharging to combined sewers can only release 90% of the peak rate of the 10-year predevelopment flow. Anything above that, tied to larger storms like the 25-, 50-, or 100-year events, has to be detained longer on-site specifically to keep the combined sewer from being overloaded.

Because parts of the city carry both sanitary sewage and stormwater in the same pipe. In dry weather, that combined flow gets fully treated before discharge, but during storms, total flow can exceed system capacity, sending a portion of it untreated straight to receiving waters. Reducing stormwater volume entering that system is a core part of Bridgeport’s approach to managing that overflow risk.

In limited cases, yes, with City Engineer approval. That relief is available if the site’s physical constraints genuinely won’t allow for a basin sized to the 100-year event, and if any resulting increase in runoff won’t adversely affect adjacent or upstream and downstream properties.

AQUALIS helps Bridgeport property owners design detention basins that meet the city’s discharge and combined sewer limits, maintain those basins to the standards the manual assigns directly to owners, and navigate the layered approval process between the Engineering Department, Water Pollution Control Authority, and Planning and Zoning Commission.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Bridgeport and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.