Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Kentucky Local Compliance

City of Frankfort / County of Franklin

At AQUALIS, we know Frankfort / County of Franklin's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Frankfort / County of Franklin and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/17/2026

Excerpt- Frankfort Stormwater Page

The Clean Water Act defines the City of Frankfort as a Phase II community. Therefore, the City is required to implement programs and practices to control polluted stormwater runoff from entering our waterways.

Franklin County Municipal Code

§ 152.06 STORM WATER MANAGEMENT APPROVAL REQUIREMENTS.

   (A)   No application for development will be approved unless it includes a storm water management plan detailing in concept how runoff and associated water quality impacts resulting from the development will be controlled or managed. This plan must indicate whether storm water will be managed on-site or off-site and, if on-site, the general location and type of practices. The Storm Water Procedures Manual outlines accepted design criteria and the information required for submittal in the storm water management plan.
 
   (B)   For development or redevelopment occurring on a previously developed site, an applicant shall be required to include within the storm water plan, measures for controlling existing storm water runoff discharges from the site in accordance with the Storm Water Procedures Manual.
 
   (C)   The storm water management plan(s) must be signed by a licensed professional engineer (PE), who will verify that the design of all storm water management practices meet the submittal requirements outlined in the Storm Water Procedures Manual or EPA’s National Menu of Best Management Practices (BMPs) for Stormwater, as applicable. By approving a plan under this chapter, the county does not accept responsibility for the design, installation and operation and maintenance of storm water BMPs.

Franklin County Stormwater Manual

3.10 Stormwater Management/BMP Facilities Operation and Maintenance

As required by the Phase II Stormwater Regulations, the City/County must require the owners of new and redevelopment property to enter into a long-term maintenance plan and agreement. This agreement requires nonresidential developments and multifamily property owners to:  Conduct routine maintenance and perform any necessary structural repairs  Complete annual self-inspection and submit documentation to the City/County of performance. 

For residential stormwater BMP facilities the City/County may maintain cleaning of impoundment structure and associated pipes and infrastructure related to long-term performance of the BMP. This maintenance generally does not include mowing or trash clean-up. Refer to Post-Construction Runoff Ordinance for the City/County for additional information on long-term maintenance requirements and guidance. A copy of the City/County Stormwater Management/BMP Facilities Operation and Maintenance Agreement is found in Appendix G of this Document.

Excerpt- Franklin County Post-Construction Runoff Ordinance

Section 4- Applicability

This ordinance shall be applicable to all subdivision or site plan applications, unless eligible for an exemption or granted a waiver by the Franklin County under the specifications of the Stormwater Procedures Manual. This ordinance also applies to land development activities that are smaller than one acre I such activities are part of a larger common plan of development as established in KPDES permit number KYG200000.

When a site development plan is submitted that qualifies as a redevelopment project as defined in the Stormwater Procedures Manual, decisions on permitting and on=site stormwater requirements shall be made after a review by the Franklin County.

Section 5- Utilization of BMP Resources

Franklin County may furnish additional policy, criteria and information including specifications and standards, for the proper implementation of the requirements for this ordinance in the form of approved Best Management Practices (BMPs), which will be located I the Franklin County’s Stormwater Procedures Manual. The Stormwater Procedures Manual will include specific design criteria and operation and maintenance requirements for stormwater BMPs. Stormwater treatment practices that are designed and constructed in accordance with these design and sizing criteria will be presumed to meet the minimum water quality performance standards. Until the development of this resource, information on stormwater BMPs is available at EPAs National Menu of Stormwater Best Management Practices.

Section 6- Requirements for Stormwater Management Approval

No application for development will be approved unless it includes a Stormwater Management Plan detailing in concept how runoff and associated Water quality impacts resulting from the development will be controlled or managed. This plan must indicate whether stormwater will be managed on-site or off-site, and, if on-site, the general location and type of practices. The Stormwater Procedures Manual outlines accepted design criteria and the information required for submittal in the Stormwater Management Plan.

For development or redevelopment occurring on a previously developed site, an applicant shall be required to include within the stormwater plan, measures for controlling existing stormwater runoff discharges from the site in accordance with the Stormwater Procedures Manual.

The Stormwater Management Plan must be signed by a licensed professional engineer, who will verify that the design of all stormwater management practices meet the submittal requirements outlined in the Stormwater Procedures Manual or EPAs National Menu as applicable. By approving a plan under this chapter, Franklin County does not accept responsibility or the design, installation, and operation and maintenance of stormwater BMPs.

Section 7- Maintenance Agreements

All nonresidential developments and multifamily stormwater treatment practices shall have an enforceable Operation and Maintenance Agreement to ensure the system functions as designed. This agreement will include any and all easements required to access and inspect the stormwater treatment practices, and to perform routine maintenance as necessary to ensure proper functioning of the stormwater treatment practice. In addition, a legally binding covenant specifying the parties responsible for the proper maintenance of all stormwater treatment practices shall be secured prior to issuance of any permits for land disturbance activities.

Section 8- Enforcement

Franklin County Planning and Zoning Department or their duly authorized designees shall be responsible for the enforcement of this Ordinance and have the authority to issue notices of violation, citations, and levy fines as described below.

  1. Enforcement procedures may be utilized if any of the following conditions exist:
    • Structural and/or non-structural BMPs are not being installed or maintained per manufacturer’s specifications and/or Franklin County
    • Construction is not in compliance with the approves Stormwater Management Plan
    • Maintenance of permanent stormwater BMPs is not sufficient after construction
    • Any of the conditions of this Ordinance are not being met
  2. Enforcement Procedures
    • For the purposes of this Ordinance, a NOV and/or citation is official by posting a copy of the notice of violation and/or citation on the construction site in reasonable proximity to a location where the violation is taking place. Additionally, a copy of the violation and/or order shall be mailed by first class mail, postage pre-paid, to the address listed by the responsible party on the Operation and Maintenance Agreement. In the case of work for which there is no Operation and Maintenance Agreement, a copy of the violation and/or order shall be mailed to the person listed as the landowner of the property.
    • NOVs are the first level of enforcement and do not include a penalty, or fine. Only one NOV will be issued for an offense before citations are utilized. An offense of the same nature as a previous offense, even if previously corrected under a NOV, will constitute a second offense to be enforced through a citation. Offenses enforced through a NOV must be corrected within five calendar days of the date of issuance or a citation will be issued.
    • For violations where no Operation and Maintenance Agreement has been recorded, Franklin County will notify the property owner or Responsible Party and cooperate for resolution prior to enforcement. Should the Responsible Party not provide stormwater structure maintenance or demonstrate a history of non-compliance of the same nature, the Franklin County may request the County Attorney to seek to obtain injunctive relief.
    • Ten calendar days after issuing the citation, Franklin County may issue a Notice of Intent to the Responsible Party, landowner, or land user stating the Franklin County’s intent to perform work necessary to comply with this Ordinance. The Franklin County may go on the land and commence work after fourteen days from issuing the notice of intent. The costs incurred by the Franklin County to perform this work shall be paid by the property owner or Responsible Party. The cost, plus interest at the rate authorized by the Franklin County, plus a reasonable administrative and attorney fee shall be billed to the property owner. Failure to reimburse the County within thirty day of billing will result in a lien being placed on the property.
    • Compliance with the provisions of this Ordinance may also be enforced by injunction.
    • Franklin County is authorized to require immediate abatement of any violation of this ordinance that constitutes an immediate threat to the health, safety, or well-being of the public. If any such violation is not abated immediately, Franklin County is authorized to enter onto private or public property and to take any and all measures required to remediate the violation. No expense related to such remediation undertaken by Franklin County shall be fully reimbursed by the property owner and/or responsible party. The cost, plus interest at the rate authorized by Franklin County plus a reasonable administrative and attorneys fee shall be billed to the property owner. Failure to reimburse the County within thirty days of billing will result in a lien being placed on the property. For the purpose of this ordinance, the ultimate party responsible for assuring compliance with the conditions set forth is the property owner.

View State Page

Frequently Asked Questions

The plan has to detail in concept how the development will control runoff and its water quality impacts, specify whether stormwater will be managed on-site or off-site, and if on-site, note the general location and type of practices proposed. It has to be signed by a licensed professional engineer who verifies the design meets the county’s Stormwater Procedures Manual or EPA’s National Menu of BMPs, though approving the plan doesn’t make the county responsible for the design, installation or maintenance of whatever BMPs get built.

Yes, and it’s a specific ongoing obligation, not a one-time signature. Nonresidential developments and multifamily property owners have to enter an enforceable Operation and Maintenance Agreement covering routine maintenance, necessary structural repairs, and annual self-inspection with documentation submitted to the county. A legally binding covenant naming who’s responsible for maintaining each stormwater practice also has to be secured before any land disturbance permit is issued.

It starts with a notice of violation, posted at the site and mailed to whoever is listed on the Operation and Maintenance Agreement, or to the landowner directly if no agreement exists. NOVs carry no fine and give five calendar days to correct the issue, but only one NOV gets issued per offense; a repeat of the same violation, even one previously corrected, escalates straight to a citation. Ten days after a citation, the county can issue a Notice of Intent to perform the corrective work itself, and can enter the property to do so 14 days after that notice.

The property owner or responsible party bears the full cost, plus interest and a reasonable administrative and attorney fee, and failing to reimburse the county within 30 days of billing results in a lien on the property. For violations posing an immediate threat to public health, safety or welfare, the county doesn’t need to go through the standard notice sequence at all. It can enter the property and remediate right away, then bill the owner for the full cost afterward.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.

Services Offered in City of Frankfort / County of Franklin and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.