EPA Requirements for Stormwater Management

At AQUALIS, we know [ENTER NAME] sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to [ENTER NAME] and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

EPA: Clean Water Act (CWA)

The EPA protects the nation’s water supply through the Clean Water Act. The Clean Water Act establishes the basic structure for regulating discharges of pollutants into the waters of the United States and regulating quality standards for surface waters. Under the CWA, EPA has implemented pollution control programs such as setting stormwater management standards for communities, developments, businesses and residential areas. The EPA has also set water quality standards for all contaminants in surface waters.

Loss of infiltration from urbanization

The porous and varied terrain of natural landscapes like forests, wetlands and grasslands traps rainwater and snowmelt and allows them to filter slowly into the ground. In contrast, impervious (nonporous) surfaces like roads, parking lots and rooftops prevent rain and snowmelt from infiltrating, or soaking, into the ground. Most of the rainfall and snowmelt remains above the surface, where it runs off rapidly in unnaturally large amounts.

Storm sewer systems concentrate runoff into smooth, straight conduits. This runoff gathers speed and erosional power as it travels underground. When this runoff leaves the storm drains and empties into a stream, its excessive volume and power blast out stream banks, damaging streamside vegetation and wiping out aquatic habitat. These increased storm flows carry sediment loads from construction sites and other denuded surfaces and eroded stream banks. They often carry higher water temperatures from streets, roof tops and parking lots, which are harmful to the health and reproduction of aquatic life.

The loss of infiltration from urbanization may also cause profound groundwater changes. Although urbanization leads to great increases in flooding during and immediately after wet weather, in many instances it results in lower stream flows during dry weather. Many native fish and other aquatic life cannot survive when these conditions prevail.

NPDES (CWA Section 402)

The National Pollutant Discharge Elimination System (NPDES) permit program, established under the federal Clean Water Act, controls water pollution by regulating sources that discharge pollutants to waters in the United States. Municipalities are required to apply for NPDES permit coverage in order to operate the storm sewer systems. Under this permit, operators are required to develop and implement a stormwater management program to reduce the discharge of pollutants to the maximum extent practicable to protect water quality.

Communities that do have storm sewer systems must create and enforce a stormwater management program that outline­­­s the minimum standards that must be met in order to satisfy the requirements of their NPDES permit and to ultimately comply with the CWA. There are six minimum control measures for every stormwater management program:

  1. Public Education and Outreach
  2. Public Participation/ Involvement
  3. Illicit Discharge Detection and Elimination
  4. Construction Site Runoff Control
  5. Post-Construction Runoff Control
  6. Pollution Prevention/Good Housekeeping

Minimum Measure #5: Post-Construction Stormwater Management

Controlling post-construction runoff, the fifth minimum requirement of the NPDES program, sets forth more standards for property owners to adhere to once construction is complete.

New development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale that discharge into the MS4 must have controls in place that would prevent or minimize water quality impacts. This includes:

  1. Strategies which include a combination of structural and/or non-structural best management                 practices (BMPs) appropriate for the community;
  2. Use an ordinance or other regulatory mechanism to address post-construction runoff from new development and redevelopment projects to the extent allowable under State, Tribal or local law; and
  3. Ensure adequate long-term operation and maintenance of BMPs.

It is the responsibility of land owners, whether commercial or residential, to manage runoff from their properties.  Per federal law, a stormwater pollution prevention plan (SWPPP) is required before any development can occur on their land. This includes site assessment, erosion and sediment control BMPs; good housekeeping BMPs; post construction BMPs; and operations, maintenance, and inspections schedules.

Structural BMPs include: storage practices such as wet ponds and extended-detention outlet structures; filtration practices such as grassed swales, sand filters and filter strips; and infiltration practices such as infiltration basins and infiltration trenches. EPA recommends that you ensure the appropriate implementation of the structural BMPs by considering some or all of the following: pre-construction review of BMP designs; inspections during construction to verify BMPs are built as designed; post-construction inspection and maintenance of BMPs; and penalty provisions for the noncompliance with design, construction or operation and maintenance. Stormwater technologies are constantly being improved, and EPA recommends that your requirements be responsive to these changes, developments or improvements in control technologies.

It is very important the land owner(s) be familiar with the post-construction BMPs onsite, because once construction is complete it is their obligation to maintain them. By adhering to the post-construction criteria set forth in the SWPPP, and understanding the local, state, and federal stormwater regulations, land owners can avoid civil, state, or federal fines.

Most Phase I & Phase II cities (cities with populations over 50,000) require a stormwater utility fee for all property owners in order to fund their stormwater program. These fees are generally based on the amount of impervious surfaces located on the property. Property owners may also be required to install stormwater management facilities on site to mitigate post-construction runoff.

The EPA can take civil and criminal action against any party that is in violation of the Clean Water Act. The EPA can also act in place of state or local governments that are not properly enforcing environmental regulations.

Services Offered in EPA Requirements for Stormwater Management and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.