Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
North Carolina Local Compliance

City of Monroe

At AQUALIS, we know Monroe's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Monroe, North Carolina and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/20/2026

Excerpt from NC Phase II Stormwater Management Ordinance

CHAPTER 159: STORMWATER MANAGEMENT ORDINANCE

159-402 Operation and Maintenance Agreement

Prior to the conveyance or transfer of any lot or building site to be served by a structural BMP pursuant to this Ordinance, and prior to issuance of any permit for development or redevelopment requiring a structural BMP pursuant to this Ordinance, the applicant or owner of the site must execute an operation and maintenance agreement that shall be binding on all subsequent owners of the site, portions of the site, and lots or parcels served by the structural BMP. Until the transference of all property, sites, or lots served by the structural BMPthe original owner or applicant shall have primary responsibility for carrying out the provisions of the maintenance agreement.

The operation and maintenance agreement shall require the owner or owners to maintain, repair and, if necessary, reconstruct the structural BMP, and shall state the terms, conditions, and schedule of maintenance for the structural BMP. In addition, it shall grant to the City of Monroe a right of entry in the event that the Stormwater Administrator has reason to believe it has become necessary to inspect, monitor, maintain, repair, or reconstruct the structural BMP; however, in no case shall the right of entry, of itself, confer an obligation on the City of Monroe to assume responsibility for the structural BMP.

The operation and maintenance agreement must be approved by the Stormwater Administrator prior to plan approval, and it shall be referenced on the final plat and shall be recorded with the county Register of Deeds upon final plat approval by the City of Monroe.

Excerpt from the City of Monroe Stormwater Administrative Manual

7.1 Purpose of the Operation and Maintenance Agreement

An Operation and Maintenance Agreement is required for all BMPs.  The purpose of this agreement is to ensure that each BMP receives adequate maintenance so that it can satisfactorily perform its pollutant removal function. The agreement also designates the responsible party who shall be in charge of maintaining the BMP.  It serves as a legal document to ensure maintenance and also outlines the routine maintenance schedule for each BMP.

7.2 Description of the Operation and Maintenance Agreement

Prior to final approval of any BMP design plans and the issuance of the Stormwater Management Permit, an Operation and Maintenance Agreement must be submitted and approved by the Stormwater Administrator for each BMP.  The Operation and Maintenance Agreement form (Stormwater Maintenance Agreement) can be found in Appendix 8.6.  The owner of the BMP has the discretion to modify this agreement provided the provisions listed below are included:

  1. Acknowledgment that the Covenanter(s) shall continuously operate and maintain the stormwater control and management facilities.
  2. Establishment of an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the structural BMPs.  If structural BMPs are not performing adequately or as intended or are not properly maintained, the City of Monroe, in its sole discretion, may remedy the situation, and in such instances the City of Monroe shall be fully reimbursed from the escrow account.  Escrowed funds may be spent by the Covenanter(s) for sediment removal, structural, biological or vegetative replacement, major repair, and reconstruction of the structural BMPs, provided that the City of Monroe shall first consent to the expenditure.
  3. Both developer contribution and annual sinking funds shall fund the escrow account.  Prior to plat recordation or issuance of construction permits, whichever shall first occur, the developer shall pay into the escrow account an amount equal to fifteen (15) percent of the initial construction cost of the structural BMPs.  Two-thirds (2/3) of the total amount of sinking fund budget shall be deposited into the escrow account within the first five (5) years and the full amount shall be deposited within ten (10) years following initial construction of the structural BMPs.  Funds shall be deposited each year into the escrow account.  A portion of the annual assessments of the Covenanter(s) shall include an allocation into the escrow account.  Any funds drawn down from the escrow account shall be replaced in accordance with the schedule of anticipated work used to create the sinking fund budget.
  4. The percent of developer contribution and lengths of time to fund the escrow account may be varied by the (name of local government) depending on the design and materials of the stormwater control and management facility.
  5. Granting to the City of Monroe a right of entry to inspect, monitor, maintain, repair, and reconstruct structural BMPs.
  6. Allowing the City of Monroe to recover from the Covenanter(s) and its members any and all costs the City of Monroe expends to maintain or repair the structural BMPs or to correct any operational deficiencies. Failure to pay the City of Monroe all of its expended costs, after forty-five days written notice, shall constitute a breach of the agreement. The City of Monroe shall thereafter be entitled to bring an action against the Covenanter(s) and its members to pay, or foreclose upon the lien hereby authorized by the agreement against the property, or both, in case of a deficiency.  Interest, collection costs, and attorney fees shall be added to the recovery.
  7. A statement that this agreement shall not obligate the City of Monroe to maintain or repair any structural BMPs, and the City of Monroe shall not be liable to any person for the condition or operation of structural BMPs.
  8. A statement that this agreement shall not in any way diminish, limit, or restrict the right of the City of Monroe to enforce any of its Ordinances as authorized by law.
  9. A provision indemnifying and holding harmless the City of Monroe for any costs and injuries arising from or related to the structural BMP, unless the City of Monroe has agreed in writing to assume the maintenance responsibility for the BMP and has accepted dedication of any and all rights necessary to carry out that maintenance.

A BMP Maintenance Plan must be attached as an Addendum to the Operation and Maintenance Agreement which identifies the specific maintenance activities to be performed for each BMP.  As part of the BMP Maintenance Plan submittal, a digital copy must include as part of the Addendum.  The Maintenance Plan shall identify each BMP using the following naming convention: “Project or subdivision name – BMP Type – Number.”  For example, Stoneridge Phase I – Bioretention 1”.  This naming convention should also mirror the BMP naming convention used on the approved design plans.  Following approval of the Operation and Maintenance Agreement and Maintenance Plan by the Stormwater Administrator, the document must be signed by the responsible party, notarized, and recorded at the Union County Register of Deeds Office with the corresponding approved Plat.  A copy of the recorded document must be provided to the Stormwater Administrator for filing within fourteen (14) days of recordation.  Receipt of this document shall be indicated in the Stormwater Management Ordinance Database and the document shall be placed in the project file.

7.3 Description of Maintenance Requirements

The Operation and Maintenance Agreement requires that each BMP be inspected by a qualified registered North Carolina professional engineer or landscape architect on an annual basis. An inspection report must be completed for each BMP indicating the status of each item inspected and any maintenance that was conducted.  The inspection report must be completed on the form provided in City of Monroe Standard Specification and Detail Manual called the City of Monroe BMP Maintenance and Inspection Checklist.  The first inspection report is due to the Stormwater Administrator within one (1) year from the date of as-built certification and each year thereafter.  The inspector shall certify on the Maintenance and Inspection Checklist that the BMP has been inspected and that at the time of the inspection the BMP was performing properly and was in compliance with the terms and conditions of the approved Operation and Maintenance Agreement and Maintenance Plan required by the Stormwater Management Ordinance.  Therefore, the inspector should allow enough time before the end of the one year time period to conduct the necessary inspections(s) and completed the necessary maintenance and repairs prior to submittal of the report.

Within two (2) weeks following the completion of inspection and maintenance activities, the owner of the BMP shall forward the signed and sealed Maintenance and Inspection Checklist to the Stormwater Administrator.  Submitted inspection forms shall be entered into the BMP maintenance database to track inspections and maintenance activities and the hard copy shall be placed in the file.  The owner of the BMP shall keep records of inspections, maintenance, and repairs for at least five (5) years from the date of creation of the record and shall submit the same upon reasonable request to the Stormwater Administrator.

7.4 Transfer of Maintenance Responsibilities

City of Monroe shall not accept maintenance responsibility of structural BMPs that are installed pursuant to the Stormwater Management Ordinance.  The owner will continue to own and maintain the pond until City of Monroe – Engineering Department is notified in writing of a transfer in ownership and maintenance responsibility.The notification will include a date for the transfer of responsibility and a letter of acceptance from the new owner.   Notify the Department within 30 days of a proposed change in ownership.

View State Page

Frequently Asked Questions

Post-construction stormwater management covers the ongoing responsibility to maintain all on-site stormwater control facilities and open space areas exactly as specified in your property’s approved stormwater control plan. If your Monroe property has structural BMPs installed under an NPDES-related development or redevelopment permit, keeping them functioning is a continuing obligation, not a one-time construction requirement. AQUALIS provides full post-construction stormwater management for property owners across Monroe, so BMPs stay compliant long after a project is finished.

Before a property is conveyed or a permit is issued in Monroe, the owner must execute a binding operation and maintenance agreement that requires the owner to maintain, repair, and if necessary reconstruct the structural BMP, funds an escrow account starting at 15 percent of initial construction costs plus annual sinking contributions, and grants the City right of entry for inspection and, if needed, repair. This agreement must be recorded with the county Register of Deeds. AQUALIS reviews existing operation and maintenance agreements for Monroe property owners and manages the maintenance activity they require.

Monroe requires an annual inspection using the city’s BMP Maintenance and Inspection Checklist, performed by a qualified North Carolina professional engineer or landscape architect, with the first report due within one year of as-built certification and every year after that. Property owners must also retain inspection and maintenance records for at least five years. AQUALIS coordinates these annual qualified inspections for Monroe property owners and maintains the five-year record history the City expects.

Monroe has the authority to inspect properties for noncompliance and issue a notice of violation for deficiencies, and because the operation and maintenance agreement includes a right-of-entry clause, the City can access the property to verify conditions directly. If maintenance is neglected long enough, the City can perform repairs itself and recover the cost from the property’s escrow account. AQUALIS provides non-compliance resolution for Monroe property owners, correcting BMP issues before they reach that point.

When ownership of a Monroe property with a structural BMP changes hands, the new owner must notify the City’s Engineering Department within 30 days, providing the transfer date and an acceptance letter, and until that notification is filed in writing, the original owner remains responsible for the BMP. This means sellers can stay on the hook for a system they no longer own if the paperwork isn’t filed promptly. AQUALIS helps both buyers and sellers of Monroe properties manage this notification process and the maintenance handoff that follows

Post-construction stormwater compliance in Monroe involves a recorded operation and maintenance agreement, an escrow account, annual qualified inspections, five-year recordkeeping, and a 30-day ownership transfer notification requirement, all of which carry compliance risk if any part is neglected. Managing all of this without dedicated stormwater staff is difficult for most property owners. AQUALIS offers complete post-construction stormwater management for Monroe property owners, covering maintenance, escrow tracking, annual inspection coordination, recordkeeping, and non-compliance resolution, so owners can meet the City’s requirements without managing the process themselves.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Monroe and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.
open manhole

From Stormwater Inspection to Full System Restoration in Morrisville, N.C.

By sealing structural damage, restoring filtration, and performing thorough cleaning, the team ensured compliance, improved water quality and prevented costly future failures.

Stormwater Pipe Inspection Reveals Systemwide Failures in Durham, N.C.

The property owners on this site noted cracking and shifting along the edge of the parking lot near stormwater assets. Understanding the gravity of the situation, they reached out to AQUALIS to conduct a preliminary inspection of the stormwater system.
excavators on the side of a hill

Sinkhole Leads to Stormwater System Repair in Durham, N.C.

The tenant on this property noticed a depression that opened to the ground below and notified the property owners.
Two Sinkholes

Sinkhole Restoration and Stormwater Repairs in Raleigh, N.C.

Sinkholes appeared in the drive lane of this complex. AQUALIS was called to investigate.
Cleared Retention Pond

Wet Detention Basin Restoration Improves Performance in Fayetteville, N.C.

A store in Fayetteville, NC provides the community with excellent customer service, and durable and long-lasting products that will hold their value for years to come.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.