Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
North Carolina Local Compliance

City of Winston Salem / County of Forsyth

At AQUALIS, we know Winston Salem's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Winston Salem, North Carolina and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/20/2026

Stormwater Management Program

The Stormwater Management Program works to restore, protect, and preserve the surface waters within the City of Winston-Salem.  The Stormwater Management Program was developed in compliance with the Federal Clean Water Act, to ensure that stormwater is effectively controlled and stormwater pollution is reduced. The City of Winston Salem has adopted a stormwater post-construction ordinance to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff associated with development and redevelopment.

It has been determined that:

Development and Redevelopment alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, flooding, soil erosion, stream channel erosion, nonpoint and point source pollution, and sediment transport and deposition, as well as reducing groundwater recharge;

These changes in stormwater runoff contribute to increased quantities of water-borne pollutants and alterations in hydrology which are harmful to public health and safety as well as to the natural environment;
These effects can be managed and minimized by applying proper design and well-planned controls to manage stormwater runoff from Development and Redevelopment sites; and

The Federal Water Pollution Control Act of 1972 (“Clean Water Act”) and federal Phase II Stormwater Rules promulgated under it, as well as rules of the North Carolina Environmental Management Commission promulgated in response to federal Phase II requirements, compel certain urbanized areas, including the City, to adopt the minimum stormwater controls such as those included in this Ordinance. Therefore, the City’s Council establishes this Ordinance to regulate the quality and quantity of stormwater runoff and discharge to meet the state and federal requirements.

CHAPTER 75 OF THE CITY CODE OF ORDINANCES –

ARTICLE IV: POST CONSTRUCTION STORMWATER

75-104 PURPOSE

(a) General. 

The purpose of this ordinance is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post construction stormwater runoff and nonpoint and point source pollution associated with development and redevelopment. It has been determined that proper management of construction-related and post construction stormwater runoff can safeguard the public health, safety, and general welfare; minimize damage to public and private property and infrastructure; and protect water and aquatic resources. This ordinance is intended to not contradict the intent or direction of the Legacy Comprehensive Plan. 

75-401 GENERAL STANDARDS FOR MAINTENANCE

(A) Function of Structural BMPs as Intended

The Owner of each Structural BMP installed pursuant to this Ordinance shall maintain and operate it so as to preserve and continue its function in controlling stormwater quality and quantity at the degree or amount of function for which the Structural BMP was designed.

(B) Annual Maintenance Inspection and Report

The person responsible for maintenance of any Structural BMP installed pursuant to this Ordinance shall submit to the Stormwater Director an inspection report from a qualified registered North Carolina professional engineer, surveyor, or landscape architect performing services only in their area of competence. The inspection report shall contain all of the following:

    1. The name and address of the Owner;
    2. The recorded book and page number of the lot of each Structural BMP;
    3. A statement that an inspection was made of all Structural BMPs;
    4. The date the inspection was made;
    5. A statement that all inspected Structural BMPs are performing properly and are in compliance with the terms and conditions of the approved maintenance agreement required by this Ordinance; and
    6. The original signature and seal of the engineer, surveyor, or landscape architect.

All inspection reports shall be on forms supplied by the Stormwater Director. An original inspection report shall be provided to the Stormwater Director beginning one year from the date of as-built certification and each year thereafter on or before the date of the as-built certification.

75-402 OPERATION AND MAINTENANCE AGREEMENT

(A) In General:

Prior to the conveyance or transfer of any portion of a Development or Redevelopment to be served by a Stormwater Management System pursuant to this Ordinance, and prior to issuance of any permit for a Development or Redevelopment requiring a Stormwater Management System pursuant to this Ordinance, the Owner must execute an operation and maintenance agreement that shall be binding on all subsequent Owners of the whole or a portion of the Development or Redevelopmentserved by the Stormwater Management System. Until the transference of all property, sites, or lots served by the Stormwater Management System, the original Owner shall have primary responsibility for carrying out the provisions of the maintenance agreement. The operation and maintenance agreement shall require the Owner to maintain, repair and, if necessary, reconstruct the Stormwater Management System, and shall state the terms, conditions, and schedule of maintenance for the Stormwater Management System. In addition, it shall grant to the City a right of entry in the event that the Stormwater Director has reason to believe it has become necessary to inspect, monitor, maintain, repair, or reconstruct the Stormwater management System. However, in no case shall the right of entry confer an obligation on the City to assume responsibility for the Stormwater Management System. The operation and maintenance agreement must be approved by the Stormwater Director prior to plan approval, and it shall be referenced on the final plat and shall be recorded with the county Register of Deeds upon final plat approval. A copy of the recorded maintenance agreement shall be given to the Stormwater Director within 14 days following its recordation.

(B) Special Requirement for Homeowners’ and Other Associations

For all Stormwater Management Systems required pursuant to this Ordinance and that are to be or are owned and maintained by a homeowners’ association, property owners’ association, or similar entity, the required operation and maintenance agreement shall include the following provisions:

    1. Acknowledge that the association shall continuously operate and maintain the entire Stormwater Management System, even though the association is required to escrow funds based on the cost to construct, maintain, operate, repair and inspect only the Structural BMPs;
    2. Establish an escrow account, which shall be used to maintain, operate, repair inspect or reconstruct the Stormwater Management System;
    3. Prior to plat recordation or issuance of construction permits, whichever shall first occur, require the Owner to pay into the escrow account, at a minimum, an amount equal to fifteen (15) per cent of the initial construction cost of the Structural BMPs;
    4. Require the home owners association to contribute into the escrow account, at a minimum, an amount satisfactory to support the operation, maintenance and annual inspection of the Structural BMPs such that:
      1. Two-thirds (2/3) of the total amount required to fund the escrow account shall be deposited into the escrow account within the first five (5) years and the full amount shall be deposited within ten (10) years following initial construction of the Structural BMPs;
      2. The association shall allocate a portion of the association’s annual assessments to the escrow account; and
      3. Any funds drawn down from the escrow account shall be replaced in accordance with the schedule of anticipated work used to originally fund the escrow account;
    5. Grant to the City a right of entry to inspect, monitor, maintain, repair, and reconstruct Stormwater Management System;
    6. Allow the City to recover from the association and its members, any and all costs the City expends to maintain or repair the Stormwater Management, System, pursuant to Section 5, Enforcement and Violations, below;
    7. A statement that this agreement shall not obligate the City to maintain or repair any Stormwater Management System, and the City shall not be liable to any person for the condition or operation of Stormwater Management System;
    8. A statement that this agreement shall not in any way diminish, limit, or restrict the right of the City to enforce any of its ordinances as authorized by law; and
    9. A provision indemnifying and holding harmless the City for any costs and injuries or claims arising from or related to the Stormwater Management System, unless the City has agreed in writing to assume the maintenance responsibility for the Stormwater Management System and has accepted dedication of any and all rights necessary to carry out that maintenance.

75-403 INSPECTION PROGRAM

Inspections and inspection programs by the City may be conducted or established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to, reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in Structural BMPs; and evaluating the condition of Structural BMPs. If the Owner of any property refuses to permit such inspection, the Stormwater Director shall proceed to obtain an administrative search warrant pursuant to NCGS §15-27.2, or its successor. No person shall obstruct, hamper or interfere with the Stormwater Director while carrying out his official duties.

75-406 RECORDS OF INSTALLATION AND MAINTENANCE ACTIVITIES

The Owner of each Stormwater Management System shall keep records of inspections, maintenance, and repairs for at least five years from the date of creation of the record and shall submit the same upon reasonable request to the Stormwater Director.

75-407 NUISANCES

The Owner of each Stormwater Management System shall maintain it so as not to create or result in a nuisance condition.

75-408 MAINTENANCE EASEMENTS

Every Stormwater Management System installed pursuant to this Ordinance shall be made accessible for adequate maintenance and repair by a maintenance easement. The easement shall be recorded and its terms shall specify who may make use of the easement and for what purposes.

SECTION 5: ENFORCEMENT AND VIOLATIONS

(A) Authority to Enforce: The provisions of this Ordinance shall be enforced by the Stormwater Director or any authorized agent of the City.

(B) Violation Unlawful: Any failure to comply with an applicable requirement, prohibition, standard, or limitation imposed by this Ordinance, or the terms or conditions of any permit or other Development or Redevelopment approval or authorization granted pursuant to this Ordinance, is unlawful and shall constitute a violation of this Ordinance.

(C) Each Day a Separate Offense: Each day that a violation continues shall constitute a separate and distinct violation or offense.

(D) Responsible Persons/Entities: Any person who erects, constructs, reconstructs, alters (whether actively or passively), or fails to erect, construct, reconstruct, alter, repair or maintain all or any portion of a Stormwater Management System in violation of this Ordinance shall be subject to the remedies, penalties, and/or enforcement actions in accordance with this section. Persons subject to the remedies and penalties set forth herein may include the Owner as well as any architect, engineer, builder, contractor, developer, agency, or any other person who has control over, the responsibility for, or the use of the property on which the violation occurs and who participates in, assists, directs, creates, causes, or maintains a condition that results in or constitutes a violation of this Ordinance, or fails to take appropriate action, so that a violation of this Ordinance results or persists.

(E) Civil penalties and costs collected pursuant to this Ordinance shall be credited to the City’s stormwater enterprise fund.

(A) Initiation/Complaint: Whenever a violation of this Ordinance occurs, or is alleged to have occurred, any person may file a complaint. Such complaint shall state fully the alleged violation and the basis thereof, and shall be filed with the Stormwater Director, who shall record the complaint. The complaint shall be investigated promptly by the Stormwater Director.

(B) Inspection: The Stormwater Director shall have the authority, upon presentation of proper credentials, to enter and inspect any land, building, structure, or premises to ensure compliance with this Ordinance.

(C) Notice of Violation and Order to Correct: When the Stormwater Director finds that any building, structure, or land is in violation of this Ordinance, the Stormwater Director shall notify, in writing, the Owner and/or other person violating this Ordinance. The notification shall indicate the nature of the violation, contain the address or other description of the site upon which the violation is occurring, order the necessary action to abate the violation, and give a deadline for correcting the violation. If civil penalties are to be assessed, the notice of violation shall also contain a statement of the amount and basis for the civil penalties to be assessed, the time of their accrual, and the time within which they must be paid or be subject to collection as a debt. The Stormwater Director may deliver the notice of violation and correction order personally, by the local law enforcement, by certified or registered mail, return receipt requested, or by any means authorized for the service of documents by Rule 4 of the North Carolina Rules of Civil Procedure. Refusal to accept the notice shall not relieve the violator of the obligations set forth herein. If a violation is not corrected within a reasonable period of time, as provided in the notification, the Stormwater Director may take appropriate action under this Ordinance to correct and abate the violation and to ensure compliance with this Ordinance.

D) Extension of time: A person who receives a notice of violation and correction order, or the owner, may submit to the stormwater director a written request for an extension of time for correction of the violation. On determining that the request includes enough information to show that the violation cannot be corrected within the specified time limit for reasons beyond the control of the person requesting the extension, the stormwater director may extend the time limit as is reasonably necessary to allow timely correction of the violation, up to, but not exceeding 60 days. The stormwater director may grant 30-day extensions in addition to the foregoing extension if the violation cannot be corrected within the permitted time due to circumstances beyond the control of the person violating this ordinance. The stormwater director shall grant an extension only by written notice of extension. The notice of extension shall state the date prior to which correction must be made, after which the violator will be subject to the penalties described in the notice of violation and correction order. 

(E)  Enforcement after time to correct: After the time has expired to correct a violation, including any extension(s) if authorized by the stormwater director, the stormwater director shall determine if the violation is corrected. If the violation is not corrected, the stormwater director may act to impose one or more of the remedies and penalties authorized by this ordinance. 

(F) Emergency enforcement: If delay in correcting a violation would seriously threaten the effective enforcement of this ordinance or pose an immediate danger to the public health, safety, or welfare, then the stormwater director may order the immediate cessation of a violation. Any person so ordered shall cease any violation immediately. The stormwater director may seek immediate enforcement, without prior written notice, through any remedy or penalty authorized by this article. 

View State Page

Frequently Asked Questions

Post-construction stormwater management covers the ongoing obligation to maintain and operate the structural BMPs and open space on your property so they preserve and continue their intended function, without creating a nuisance condition. If your property in Winston-Salem or Forsyth County has stormwater controls installed under an approved plan, that plan comes with a permanent maintenance responsibility, not a one-time construction requirement. AQUALIS provides full post-construction stormwater management for property owners across Winston-Salem and Forsyth County, so BMPs stay compliant well after a project is finished.

Winston-Salem requires an annual maintenance inspection report, submitted by a qualified North Carolina professional engineer, surveyor, or landscape architect, beginning one year after the BMP’s as-built certification and continuing every year afterward. The report must include the property owner’s name, the property location, the inspection date, a compliance statement, and the inspecting professional’s seal. AQUALIS coordinates these annual, qualified inspections for property owners in Winston-Salem and Forsyth County and manages the reporting schedule so nothing is missed.

Before a stormwater permit is issued or a property changes hands in Winston-Salem, the owner must execute a binding operation and maintenance agreement that specifies the maintenance terms and schedule for the site’s BMPs, grants the City inspection rights, and states that the City assumes no responsibility for ongoing upkeep. This means the maintenance obligation rests entirely with the property owner, not the City. AQUALIS reviews existing operation and maintenance agreements for Winston-Salem property owners and manages the maintenance activity they require.

If a structural BMP is not being maintained so as to preserve and continue its function, or if it creates a nuisance condition, the property owner is responsible for correcting the problem, and the City has authority to inspect the property and issue a notice of violation for noncompliance. Waiting until the annual inspection report surfaces the issue often means a more costly fix. AQUALIS provides maintenance and non-compliance resolution for Winston-Salem and Forsyth County property owners, addressing BMP problems before they become a violation.

Yes. Beyond the required annual report, the City of Winston-Salem retains the authority to inspect properties for noncompliance, and the recorded operation and maintenance agreement grants the City the right to access the site for that purpose. Property owners in Winston-Salem and Forsyth County should assume their BMPs could be reviewed at any time, not just during the scheduled annual inspection. AQUALIS keeps properties inspection-ready year-round, managing the maintenance record so an unannounced visit does not turn into a violation.

Because operation and maintenance agreements in Winston-Salem are executed before property transfer, the maintenance obligation and annual inspection reporting requirement carry over to the new owner automatically, regardless of who built or originally permitted the system. This is a common surprise for buyers of previously developed property in Winston-Salem and Forsyth County. AQUALIS steps in as the party managing this ongoing responsibility, reviewing what agreement is on file and taking over the required maintenance and reporting.

Post-construction stormwater compliance in Winston-Salem involves a binding operation and maintenance agreement, annual reports from a licensed professional, homeowners association escrow requirements, and the risk of a notice of violation if any part of it is neglected. Managing all of this without dedicated stormwater staff is difficult for most property owners. AQUALIS offers complete post-construction stormwater management for Winston-Salem and Forsyth County property owners, covering maintenance, annual inspection coordination, escrow tracking, and non-compliance resolution, so owners can meet the City’s requirements without managing the process themselves.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Winston Salem / County of Forsyth and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.
open manhole

From Stormwater Inspection to Full System Restoration in Morrisville, N.C.

By sealing structural damage, restoring filtration, and performing thorough cleaning, the team ensured compliance, improved water quality and prevented costly future failures.

Stormwater Pipe Inspection Reveals Systemwide Failures in Durham, N.C.

The property owners on this site noted cracking and shifting along the edge of the parking lot near stormwater assets. Understanding the gravity of the situation, they reached out to AQUALIS to conduct a preliminary inspection of the stormwater system.
excavators on the side of a hill

Sinkhole Leads to Stormwater System Repair in Durham, N.C.

The tenant on this property noticed a depression that opened to the ground below and notified the property owners.
Two Sinkholes

Sinkhole Restoration and Stormwater Repairs in Raleigh, N.C.

Sinkholes appeared in the drive lane of this complex. AQUALIS was called to investigate.
Cleared Retention Pond

Wet Detention Basin Restoration Improves Performance in Fayetteville, N.C.

A store in Fayetteville, NC provides the community with excellent customer service, and durable and long-lasting products that will hold their value for years to come.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.