Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Colorado Local Compliance

City of Colorado Springs

At AQUALIS, we know Colorado Springs' sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Colorado Springs and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 07/22/2026

The City of Colorado Springs has enacted a Stormwater Ordinance in order to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing in watersheds within this jurisdiction.  The City of Colorado Springs is the permitting authority for all land disturbing activities and requires the land owner to maintain all on-site stormwater control facilities and all open space areas (e.g. parks or “green” areas) required by the approved stormwater control planThe City of Colorado Springs will only provide construction permits to projects that establish a plan to manage stormwater runoff occurring during the construction process. The City of Colorado Springs, under the NPDES program, also has the authority to inspect properties for noncompliance and can issue a notice of violation (NOV) for any deficiency or infraction onsite. Property owners are responsible for the maintenance of any stormwater facilities or practices located on the property. The City of Colorado Springs has the authority to inspect stormwater facilities and practices in order to ascertain that they are properly maintained and functioning.

Excerpt from Colorado Springs Code

The city requires Best Management Practices (BMPs) for new construction and redevelopment in order to treat stormwater runoff from a site. A requirement for inspections was added to ensure the proper functioning and maintenance of BMPs. The BMP requirements are currently an addendum to The City of Colorado Springs Drainage Criteria Manual, Volume 2.

The program requires the owner of a new development with a permanent BMP to enter into a Maintenance Agreement (MA) with the City of Colorado Springs, ensuring the owner will inspect and maintain their BMP. The MA binds the owner and all future owners in perpetuity to maintain their BMP and gives the city the authority to maintain the BMP, if the owner fails to do so, at the owner’s expense.  

The owner is responsible for submitting an annual inspection and copies of all inspection and maintenance forms by May 31st of each year to the City of Colorado Springs.  

Stormwater quality protection is authorized by City Code Chapter 3, Article 8 –Storm Water Quality Management and Discharge Control Code. The City’s MS4 permit is coordinated by the City’s Engineering Division. The MS4 permit requires that they develop and implement certain programs. There are six programs within the MS4 permit and each program has specific tasks that must be achieved or completed within a given time period. The six programs include the following:

1. Commercial/Residential Management Program

2. Illicit Discharges Management Program

3. Industrial Facilities Program

4. Construction Sites Program

5. Pollution Prevention/Good Housekeeping for Municipal Operations

6. Monitoring Program

As a permittee, the City was required to develop, implement, and enforce a pollutant control program to reduce pollutants in stormwater runoff to their MS4 from construction activities that result in land disturbance of one or more acres, including projects less than one acre that are part of a larger common plan of development or sale, as well as address post-construction runoff. Under the post-construction stormwater management in new development and redevelopment provisions, the MS4 permit requires the permittee to develop, implement, and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that discharge into the MS4. The program must ensure controls are in place that would prevent or minimize water quality impacts.

Excerpt from Drainage Criteria Manual

Maintenance and post-construction requirements for the City of Colorado Springs can be found in the Drainage Criteria Manual Stormwater Quality Polices and Best Management Practices published in May 2014.

Chapter 6: BMP Maintenance

In order for stormwater BMPs to be effective, proper maintenance is essential. Maintenance includes both routinely scheduled activities, as well as non-routine repairs that may be required after large storms, or as a result of other unforeseen problems. BMP maintenance is the responsibility of the entity owning the BMP. Municipal separate storm sewer system (MS4) permittees are required to implement and enforce a maintenance program that results in maintenance of public and private BMPs. The City of Colorado Springs, City Engineering Division is the MS4 permittee responsible for ensuring maintenance of private and public BMPs within the City of Colorado Springs’ boundaries.

For private facilities, such as those owned and maintained by homeowners’ associations, there is often a lack of understanding of maintenance required for BMPs. Maintenance plans and agreements must be prepared and submitted as part of the development review/approval process and be recorded with the property. It is also important to educate the general public on the purpose and function of stormwater BMPs. This is critical in cases where Low Impact Development (LID) or other BMPs are distributed throughout multiple parcels in developments.

Inspection and Maintenance Plans (IM Plans) are prepared as an appendix to the Final Drainage Report or as stand-alone documents and developed concurrently with the design of the facility and submitted with either the Final Drainage Report as an appendix, or the Erosion and Stormwater Quality Control Plan for approval. IM Plans are required to ensure the continued function of the BMPs as designed and constructed. Example IM Plans are available online (see the City of Colorado Springs website). IM Plans have the following key components:

1. A description of the stormwater BMP and inspection and maintenance procedures.

2. Standard Operating Procedures that provide a description of the maintenance requirements and expected frequency of actions, which can be obtained from discussion within this chapter or may be available online (see the City of Colorado Springs website). Include instruction on how to access each component of each BMP and with what equipment. It is important to identify maintenance requirements related directly to the water quality functions of the BMP and provide information concerning future site work that could potentially impact the integrity of the BMP. This is particularly true for vegetated BMPs. For example, the following maintenance requirements may be important for a rain garden (bioretention):
Provide frequent weed control in the first three years following installation and as needed for the life of the facility. Weeding should be performed mechanically, either by hand or by mowing (after establishment of the vegetation). Remove debris from area and outlet. Ensure cleanout caps remain watertight.

3. Self-inspection requirements for the responsible parties and inspection forms or checklists appropriate for the facilities in place at the site.

4. Maintenance forms that can be used by the responsible party to document activities performed.

5. Annual Inspection and Maintenance Reporting forms that are to be used by the responsible party to document activities and be submitted to the MS4 permittee. The responsible party is required to keep inspection and maintenance forms and other IM Plan documentation for 3 years. The responsible party is required to provide records of all maintenance and repairs to the MS4 permittee upon request.

6. As-built drawings that show the BMP as it was constructed.

7. PE Certification for the constructed BMP. Once construction is complete, as-built plan certification shall be submitted by a Professional Engineer (PE) in the State of Colorado to ensure that constructed stormwater management practices and conveyance systems comply with the specifications contained in the approved plans. At a minimum, as-built certification shall include a set of drawings comparing the approved plans with what was constructed. For public projects, a certificate of completion may be used as an alternate to the PE certification. For private BMPs, aMaintenance Agreement is required that binds the owner to perform the requirements of the IM Plan and documents that the owner is aware of, and will abide by, their maintenance responsibilities. Unless a treatment BMP is dedicated to and accepted by the MS4 permittee, the Chapter 6 BMP Maintenance May 2014 City of Colorado Springs 6-3 Drainage Criteria Manual, Volume 2 responsible party must execute a Maintenance Agreement binding on all subsequent owners of land served by the BMP. This agreement is a legally recorded document that acts as a property deed restriction, and therefore, provides for long-term maintenance of treatment BMP. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. The agreement provides that in the event that maintenance or repair is neglected, or the treatment BMP becomes a danger to public health or safety, the MS4 permittee has the authority to enter the property, perform the maintenance work required, and to recover the costs from the owner. The terms of the Maintenance Agreement shall provide for the MS4 permittee to enter the property at reasonable times and in a reasonable manner for the purpose of inspection or maintenance and to confirm the information in the annual inspection report submitted by the responsible party for maintenance. This includes the right to enter a property when there is a reasonable basis to believe that inspection and maintenance are not occurring or have not occurred and to enter when necessary to perform maintenance at the responsible party’s expense. A template of the Maintenance Agreement is available online (City of Colorado Springs website). Erosion and Stormwater Quality Plan financial assurances will not be released until the above IM Plan and Maintenance Agreement requirements have been met and the Maintenance Agreement is recorded.

Self-Inspections
The responsible party shall perform self-inspections of stormwater BMPs on a periodic basis in accordance with the approved IM Plan, document the inspection(s), and submit an annual inspection and maintenance report to the MS4 permittee (The City of Colorado Springs requires the reports be submitted by May 31 of each year).

MS4 Permit Inspections
The MS4 permittee will inspect private and public facilities once during the first year of operation and then once every three to five years, depending on the type of BMP, maintenance history, and other factors. Facilities will also be inspected by the MS4 permittee once a notice of violation has been issued for not performing self-inspections. A Notification of Inspection Letter will be sent to the responsible party to inform them that an inspection is scheduled. The letter will include the date of the inspection, what to expect, and encourage the completion of routine maintenance actions by the responsible party prior to the inspection.

In the event that the self-inspections are not submitted to the MS4 permittee per the required deadline, the responsible party will be contacted and notified of the missed inspection. The responsible party must complete the self-inspection and return it by mail to the MS4 permittee within the timeframe identified in local code or otherwise a notice of violation (NOV) may be issued. Appeals of NOVs can be made using the process identified in local code.

If deficiencies are noted during the MS4 permittee inspection, the responsible party will be notified of the issues. The responsible party shall correct the deficiencies within the timeframe specifies by local code. A follow-up inspection will be conducted by the MS4 permittee to verify the repairs. If repairs are not undertaken or are not found to be done properly, MS4 permittee staff or a hired contractor engaged by the MS4 permittee may enter upon the subject private property and complete the necessary maintenance at the responsible party’s expense. Recovery of the costs by the MS4 permittee shall follow practices permitted by local code.

If, during a MS4 permittee inspection, it is noted that the condition of a BMP presents an immediate danger to the public health or safety due to an unsafe condition or improper maintenance, immediate action can be taken by the MS4 permittee to protect the public and make the facility safe. Per local code, any cost incurred by the MS4 permittee is at the responsible party’s expense.

View State Page

Frequently Asked Questions

Yes. Any owner of new development with a permanent BMP has to enter into a Maintenance Agreement with the city, binding that owner and every future owner in perpetuity to inspect and maintain the BMP. If maintenance is neglected, the agreement gives the city authority to step in and perform the work at the owner’s expense.

Yes, by a fixed date. The responsible party has to submit an annual inspection report along with copies of all inspection and maintenance forms to the city by May 31 each year. Missing that deadline triggers a follow-up contact from the city, and continued non-compliance can lead to a notice of violation.

Once during the facility’s first year of operation, then once every three to five years afterward, depending on the type of BMP and its maintenance history. Facilities also get inspected outside that schedule if a notice of violation has already been issued for failing to submit self-inspections.

Quite a bit: a description of the BMP and its maintenance procedures, standard operating procedures with expected maintenance frequency, self-inspection checklists, maintenance documentation forms, annual reporting forms, as-built drawings, and professional engineer certification confirming the constructed BMP matches the approved plans.

At least three years. The responsible party has to retain all inspection and maintenance forms and related IM Plan documentation for that period, and has to provide those records to the city on request.

The city notifies you and sets a deadline under local code to make the correction. A follow-up inspection then confirms whether the repair actually happened. If it hasn’t, or wasn’t done properly, city staff or a hired contractor can enter the property, complete the maintenance, and recover the cost from you.

Yes. If an inspection finds a BMP presents an immediate danger to public health or safety due to an unsafe condition or improper maintenance, the city can take immediate action to make the facility safe, with the cost charged to the responsible party regardless of the usual notice-and-correction timeline.

Yes, and that transfer has to be handled formally. The agreement acts as a recorded property deed restriction, so if any portion of the land served by the BMP is sold or transferred, legally binding arrangements have to pass inspection and maintenance responsibility to the new owner. It doesn’t lapse just because ownership changes hands.

AQUALIS helps Colorado Springs property owners prepare Inspection and Maintenance Plans and Maintenance Agreements for permanent BMPs, meet the annual May 31 self-certification deadline, and respond quickly to a city inspection finding before it escalates to city-directed repair work at the owner’s expense.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Colorado Springs and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.