Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Massachusetts Local Compliance

Town of Framingham

At AQUALIS, we know Framingham sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Framingham and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated XX/XX/XXXX

Excerpt from Stormwater Regulations

3. Operation and Maintenance Plan (Drawings and Narrative) in addition to items listed in section above this plan should also contain:

In addition to compliance with the Stormwater Management Handbook, the Operation and Maintenance Plan (the O & M Plan) shall be designed to ensure compliance the Massachusetts Surface Water Quality Standards (314 CMR 4.00) in all seasons and throughout the life of the system. When applicable, Stormwater Management easements will be required for all areas used for off-site stormwater control, unless the Stormwater Authority grants a waiver.

a. The location of the systems and facilities including all stormwater and low-impact development best management practices, catch basins, manholes/access lids, pipes, and other stormwater devices;

b. The location(s) of Stormwater Management easements provided by the property owner(s) as necessary for:

i. Access for facility inspections and maintenance;

ii. Preservation of stormwater runoff conveyance, infiltration, and detention areas and facilities, including flood routes for the 100- year storm event; iii. Direct maintenance access by heavy equipment to structures requiring regular maintenance.

c. The names, addresses and contact information of the property owner;

d. The names, addresses and contact information of the person(s) responsible for site operation and maintenance;

e. The person(s) responsible for financing maintenance and emergency repairs;

f. A list of easements with the purpose of each; and

g. An Inspection and Maintenance Schedule for all stormwater management facilities, including what routine and non-routine maintenance tasks are to be performed, when they are to be conducted, who is to perform them, and to whom to report results (per SECTION, Annual Reports).

h. Maintenance Inspections

i. Stormwater management facilities and practices included in an O & M Plan with a Maintenance Agreement in accordance with Section 6.M of these Regulations shall undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the Plan and these Regulations.

ii. At a minimum, inspections shall occur once every year. A Maintenance Agreement as specified under Section 6.M of these Regulations between the owner and the Stormwater Authority shall be executed for privately owned stormwater management systems that specify the Responsible Party for conducting long term inspections.

i. Records of Maintenance and Repair Activities Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to the Stormwater Authority upon request. Parties responsible for the operation and maintenance of a stormwater management facility shall prepare records of the installation and of all maintenance and repairs, and shall retain the records for the most recent five years. These records shall be made available to the Stormwater Authority during inspection of the facility and upon request.

4. Budget and Timeline in addition to items listed in section above this plan should also contain:

a. A pre-construction, construction and post-construction budget should be included in the project description. Any variances should be noted and communicated as soon as discovered to the Stormwater Authority.
b. A timeline should be included in the project description. Any variances should be noted and communicated as soon as discovered to the Stormwater Authority.

C. If in the applicant’s opinion one or more of the Stormwater Management Standards or other requirements cannot be reasonably met, the applicant shall provide a detailed explanation in the Stormwater Report. This narrative shall include reasons that the requirement or Standard could not be met and a description of potential consequences if no mitigating measures are provided. 

View State Page

Frequently Asked Questions

Danvers received Notice of Intent approval from the EPA and the Massachusetts Department of Environmental Protection on April 5, 2019, authorizing stormwater discharge from its municipal separate storm sewer system under the terms of the MS4 General Permit. Under the permit’s illicit discharge detection and elimination plan, the town is required to perform dry weather outfall screening and sampling, completed within three years of the permit’s effective date.

Beyond standard site information, the plan must show the location of all stormwater facilities and best management practices, including catch basins, manholes, and pipes. It also needs contact information for the property owner and whoever is responsible for site operation, maintenance, and financing repairs, along with a full inspection and maintenance schedule detailing what tasks are performed, when, and by whom.

Stormwater management easements are required for any areas used for off-site stormwater control, unless the Stormwater Authority grants a waiver. Easements must cover access for facility inspections and maintenance, preservation of runoff conveyance and detention areas including flood routes for a 100-year storm event, and direct maintenance access for heavy equipment.

At minimum, inspections must occur once a year. Privately owned stormwater management systems need an executed maintenance agreement between the owner and the Stormwater Authority that names the responsible party for conducting these ongoing inspections.

Records of installation, maintenance, and repairs must be retained for the most recent five years. These records need to be available to the Stormwater Authority during facility inspections and provided upon request at any other time.

If the applicant believes a standard or requirement can’t reasonably be met, the stormwater report must include a detailed explanation of why, along with a description of the potential consequences if no mitigating measures are put in place.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in Town of Framingham and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.